共 50 条
- [24] POTENTIAL CREW HAZARDS DUE TO RADIOACTIVE CLOUD PENETRATIONS AVIATION SPACE AND ENVIRONMENTAL MEDICINE, 1975, 46 (03): : 281 - 289
- [25] Risk analysis of wedge joint temporary structures during construction APPLICATIONS OF STATISTICS AND PROBABILITY IN CIVIL ENGINEERING, VOLS 1 AND 2, 2003, : 1689 - 1694
- [26] The construction of temporary structures by CSG method in Tokuyama Dam project ROLLER COMPACTED CONCRETE DAMS, 2003, : 499 - 509
- [27] Pitfalls in builder's risk insurance for temporary structures in construction Pract Period Struct Des Constr, 4 (153-155):
- [28] Workplace Safety in Atlanta's Construction Industry: Institutional Failure in Temporary Staffing Arrangements WORKING USA-THE JOURNAL OF LABOR AND SOCIETY, 2006, 9 (01): : 59 - 77
- [29] OCCUPATIONAL-HEALTH SURVEY - AN EVALUATION OF POTENTIAL HEALTH-HAZARDS IN THE WORKPLACE AMERICAN INDUSTRIAL HYGIENE ASSOCIATION JOURNAL, 1981, 42 (02): : 160 - 164