Factors influencing the selection of delay analysis methods in construction projects in UAE

被引:16
|
作者
Abdelhadi, Yazeed [1 ]
Dulaimi, Mohammed Fadhil [2 ]
Bajracharya, Arun [3 ]
机构
[1] Riverside Ctr, Delay Expert Serv, HKA, Level 35,123 Eagle St, Brisbane, Qld 4000, Australia
[2] Leeds Beckett Univ, Sch Built Environm & Engn, Leeds LS2 8AJ, W Yorkshire, England
[3] Heriot Watt Univ Malaysia, Sch Energy Geosci Infrastruct & Soc, Putrajaya, Malaysia
关键词
Delay analysis methods; selection of DAMs; construction projects; qualitative data; UAE;
D O I
10.1080/15623599.2018.1435155
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Several delay analysis methods (DAMs) have been developed and used in the construction industry in order to analyse the causes and effects of delay events. In this research, a number of commonly used DAMs, in the specific context of UAE, are investigated by exploring the factors influencing their selection decisions as well as the process of making such a decision. A total of eight expert respondents from five different projects in the UAE were selected who provided critical insight into the decision-making process adopted in practice to select a DAM. The individual project case analysis as well as the cross case analysis helped to identify a number of factors that influence the selection of DAMs in UAE projects. Some of the main identified factors were the attitude of the client, experience of the delay analyst, reputation and impartiality of the delay analyst, complexity of the project, and cost and timing of performing the analysis. The research argues that such an important decision process that can have a serious impact on the success of a commercial venture requires individual organizations to develop and adopt clear guidelines on how such decisions are made to protect its commercial interests.
引用
收藏
页码:329 / 340
页数:12
相关论文
共 50 条
  • [21] Key Success Factors Impacting the Success of Innovation in UAE Construction Projects
    Faried, Mansour
    Saad, Malak
    Almarri, Khalid
    PROCEEDINGS OF 3RD INTERNATIONAL SUSTAINABLE BUILDINGS SYMPOSIUM (ISBS 2017), VOL 2, 2018, 7 : 482 - 505
  • [22] Value Engineering for Construction Projects in UAE
    Jayakumar, Ratnam
    ICVE&VM 2009: PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON VALUE ENGINEERING AND VALUE MANAGEMENT, 2009, : 3 - 12
  • [23] Confirmatory factor analysis of the positive factors influencing the performance of Ghanaian construction projects
    Akomah, Benjamin Boahene
    Ramani, Prasanna Venkatesan
    CONSTRUCTION INNOVATION-ENGLAND, 2024,
  • [24] Risk Response Development in Construction Projects Delay: Multiple Case Studies from UAE
    Motaleb, Omayma
    ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2021, 7 (03)
  • [25] Analysis of factors influencing HSE management and project performance in international construction projects
    Sun H.
    You R.
    Tang W.
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 2022, 62 (02): : 230 - 241
  • [26] Factors influencing school building construction projects abandonment
    Damoah, Isaac Sakyi
    Tingbani, Ishmael
    Kumi, Desmond Kwadjo
    Akwei, Cyntia C.
    Amoako, Isaac Oduro
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (06) : 961 - 976
  • [27] Factors influencing safety performance on construction projects: A review
    Mohammadi, Amir
    Tavakolan, Mehdi
    Khosravi, Yahya
    SAFETY SCIENCE, 2018, 109 : 382 - 397
  • [28] Influencing factors of outsourcing in construction projects: a holistic perspective
    Ma, Danfeng
    Chen, Yongqiang
    Fu, Yongcheng
    Meng, Chao
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2022, 15 (02) : 396 - 422
  • [29] Research on the Factors Influencing the Construction of Railway EPC Projects
    Kang, Jingliang
    Zheng, Hemin
    Journal of Railway Engineering Society, 2023, 40 (04) : 94 - 98
  • [30] An exploration into cost-influencing factors on construction projects
    Cheng, Ying-Mei
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (05) : 850 - 860