Factors influencing the selection of delay analysis methods in construction projects in UAE

被引:16
|
作者
Abdelhadi, Yazeed [1 ]
Dulaimi, Mohammed Fadhil [2 ]
Bajracharya, Arun [3 ]
机构
[1] Riverside Ctr, Delay Expert Serv, HKA, Level 35,123 Eagle St, Brisbane, Qld 4000, Australia
[2] Leeds Beckett Univ, Sch Built Environm & Engn, Leeds LS2 8AJ, W Yorkshire, England
[3] Heriot Watt Univ Malaysia, Sch Energy Geosci Infrastruct & Soc, Putrajaya, Malaysia
关键词
Delay analysis methods; selection of DAMs; construction projects; qualitative data; UAE;
D O I
10.1080/15623599.2018.1435155
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Several delay analysis methods (DAMs) have been developed and used in the construction industry in order to analyse the causes and effects of delay events. In this research, a number of commonly used DAMs, in the specific context of UAE, are investigated by exploring the factors influencing their selection decisions as well as the process of making such a decision. A total of eight expert respondents from five different projects in the UAE were selected who provided critical insight into the decision-making process adopted in practice to select a DAM. The individual project case analysis as well as the cross case analysis helped to identify a number of factors that influence the selection of DAMs in UAE projects. Some of the main identified factors were the attitude of the client, experience of the delay analyst, reputation and impartiality of the delay analyst, complexity of the project, and cost and timing of performing the analysis. The research argues that such an important decision process that can have a serious impact on the success of a commercial venture requires individual organizations to develop and adopt clear guidelines on how such decisions are made to protect its commercial interests.
引用
收藏
页码:329 / 340
页数:12
相关论文
共 50 条
  • [1] Factors Influencing the Delay of Road Construction Projects in Northern Mindanao, Philippines
    Cabahug, Ruel R.
    Arquita, Mariell B.
    De La Torre, Sheena Marie E.
    Valledor, Michelle S.
    Olivares, Shiela Mae D.
    MINDANAO JOURNAL OF SCIENCE AND TECHNOLOGY, 2018, 16 : 187 - 197
  • [2] Factors influencing the selection of delay analysis methodologies
    Braimah, Nuhu
    Ndekugri, Issaka
    International Journal of Project Management, 2008, 26 (08) : 789 - 799
  • [3] Factors influencing the spread of green building projects in the UAE
    Yas, Zinah
    Jaafer, Kamal
    JOURNAL OF BUILDING ENGINEERING, 2020, 27
  • [4] Delay Analysis Methods for Construction Projects: Mathematical Modelling
    Vasilyeva-Lyulina, Alena
    Onishi, Masamitsu
    Kobayashi, Kiyoshi
    INTERNATIONAL JOURNAL OF TRANSPORTATION, 2015, 3 (01): : 27 - 36
  • [5] Research on Factors Influencing Project Delivery System selection for Construction Projects
    Liu, Bingsheng
    Fu, Meiqing
    Shen, Geoffrey
    Tai, Shuangliang
    Zhang, Shiruo
    ICCREM 2017: PROJECT MANAGEMENT AND CONSTRUCTION TECHNOLOGY, 2017, : 292 - 302
  • [6] Inhibiting Factors of Cost Performance in UAE Construction Projects
    Alhammadi, Ahmed Salem Ahmed Marey
    Memon, Aftab Hameed
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2020, 11 (02): : 126 - 132
  • [7] Key contractor selection criteria for green construction projects in the UAE
    El-Sayegh, Sameh M.
    Basamji, Munir
    Ahmad, Ahmad Haj
    Zarif, Nizar
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, : 1240 - 1250
  • [8] An investigation of factors influencing selection of construction project managers for sustainable renovation projects
    Dadzie, John
    Sebitla, Buccah G.
    COGENT ENGINEERING, 2023, 10 (01):
  • [9] Significant factors causing delay in the UAE construction industry
    Faridi, Arshi Shakeel
    El-Sayegh, Sameh Monir
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (11) : 1167 - 1176
  • [10] Influencing factors indicating time delay in construction projects: impact of firm size and experience
    Maqsoom, Ahsen
    Choudhry, Rafiq M.
    Umer, Muhammad
    Mehmood, Tahir
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, : 1 - 12