共 50 条
- [41] CALCULATION FOR PART-LOAD OPERATION OF COMBINED GAS-STEAM TURBINE PLANTS BROWN BOVERI REVIEW, 1978, 65 (10): : 672 - 679
- [42] COMBINED REHEAT GAS TURBINE-STEAM TURBINE CYCLE .2. LM5000 GAS GENERATOR APPLIED TO THE COMBINED REHEAT GAS TURBINE-STEAM TURBINE CYCLE JOURNAL OF ENGINEERING FOR POWER-TRANSACTIONS OF THE ASME, 1980, 102 (01): : 42 - 49
- [45] A gas turbine cycle selection issue - Recuperated or ICR PROCEEDINGS OF THE ASME TURBO EXPO, VOL 3, 2007, : 373 - 381
- [46] Optimization calculation of characteristic parameters of gas-steam combined cycle system combusting crude gas and purge gas CHALLENGES OF POWER ENGINEERING AND ENVIRONMENT, VOLS 1 AND 2, 2007, : 99 - 102
- [47] The analysis and solution of contact rubbing fault for low pressure rotor of gas-steam combined cycle turbine unit 2019 5TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESOURCES AND ENVIRONMENT ENGINEERING (ICAESEE 2019), 2020, 446
- [48] ENERGY AND COST EFFECTIVENESS ANALYSIS OF STEAM AND GAS-STEAM COMBINED HEAT AND POWER PLANTS RYNEK ENERGII, 2008, (05): : 41 - 44
- [49] Development and domestication of large size heat recovery boiler for gas-steam combined cycle generating unit Zhongguo Dianli/Electric Power, 2001, 34 (12):
- [50] Design features and commissioning of first domestically-made heat recovery boiler and steam turbine in a 175 MW gas-steam combined cycle generating unit Zhongguo Dianli/Electric Power, 2002, 35 (11):