Integrated Vendor-Buyer Inventory Model Considering Imperfect Quality and Inspection Errors with Controllable Lead Time

被引:0
|
作者
Sofiana, A. [1 ]
Rosyidi, C. N. [1 ]
机构
[1] Univ Sebelas Maret, Master Program Ind Engn, Surakarta, Indonesia
关键词
imperfect quality; inspection errors; lead time; supply chain;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A joint production-inventory model of twostages (vendor-buyer) for items by considering defective items and inspection errors with controllable lead time is developed in this paper. The assumption of the demand is assumed to be normal distribution. The production process is not perfect, which is produces a paticular number of defective items. An inspection process of the shipment lot is hold by the buyer to sort out the item qualities. The human inspector may missclassify a defective item as a good one or missclassify a good item item as defective one. The lead time of shipment can directly affects inventory investment in safety stock, the customer service level, and the competitive abilities of a business, so we decide to take lead time also as control object. An optimal solution for the expected integrated total annual cost is provided and for the illustrative purpose, numerical example is also presented. This paper gives complement to the current literatures that used in this study, so that this one model can cover all aspects that considered in the previous literatures.
引用
收藏
页码:1321 / 1325
页数:5
相关论文
共 50 条
  • [31] Integrated decision models for a vendor-buyer supply chain with inspection errors and purchase and repair options
    Khan, Mehmood
    Ahmad, Abdul-Rahim
    Hussain, Matloub
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2019, 104 (9-12): : 3221 - 3228
  • [32] A Periodic Review Model for Vendor-Buyer System with Inspection Errors and Adjusted Production Rate
    Mayangsari, Selvia
    Jauhari, Wakhid Ahmad
    Kurdhi, Nughtoh Arfawi
    2016 2ND INTERNATIONAL CONFERENCE OF INDUSTRIAL, MECHANICAL, ELECTRICAL, AND CHEMICAL ENGINEERING (ICIMECE), 2016, : 22 - 26
  • [33] An integrated vendor-buyer model with quadratic demand under inspection policy and preservation technology
    Pervin, Magfura
    Roy, Sankar Kumar
    Weber, Gerhard-Wilhelm
    HACETTEPE JOURNAL OF MATHEMATICS AND STATISTICS, 2020, 49 (03): : 1168 - 1189
  • [34] How accurate is the integrated vendor-buyer continuous model?
    David, Israel
    Eben-Chaime, Moshe
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 114 (02) : 805 - 810
  • [35] Advance payment based vendor-buyer production inventory model with stochastic lead time and continuous review policy
    Barman, Dipak
    Mahata, Gour Chandra
    Das, Barun
    OPSEARCH, 2021, 58 (04) : 1217 - 1237
  • [36] Coordinating Vendor-Buyer decisions for Imperfect Quality Items considering Trade Credit and fully backlogged shortages
    Khanna, Aditi
    Gautam, Prerna
    Jaggi, Chandra K.
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON COMMUNICATION SYSTEMS (ICCS-2015), 2016, 1715
  • [37] The effect of working environment aspects on a vendor-buyer inventory model
    Sobhani, A.
    Wahab, M. I. M.
    Jaber, M. Y.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2019, 208 : 171 - 183
  • [38] A vendor-buyer integrated model under production uncertainty
    Hwang J.
    Wan Y.-W.
    Hwang, Juhwen (hjw@mail.ndhu.edu.tw), 1600, Taylor and Francis Ltd. (34): : 90 - 104
  • [39] An integrated vendor–buyer inventory model with imperfect items and planned back orders
    Jia-Tzer Hsu
    Lie-Fern Hsu
    The International Journal of Advanced Manufacturing Technology, 2013, 68 : 2121 - 2132
  • [40] Integrated vendor–buyer cooperative inventory model with controllable lead time, ordering cost reduction, and service-level constraint
    Sara Shahpouri
    Parviz Fattahi
    Ali Arkan
    Kia Parsa
    The International Journal of Advanced Manufacturing Technology, 2013, 65 : 657 - 666