Real-time freight locomotive rescheduling and uncovered train detection during disruption

被引:24
|
作者
Sato, Keisuke [1 ]
Fukumura, Naoto [1 ]
机构
[1] Railway Tech Res Inst, Transport Informat Technol Div, Kokubunji, Tokyo 1858540, Japan
关键词
Transportation; Real-time locomotive rescheduling; Column generation; Set-covering relaxation; Constrained shortest path; SCHEDULE RECOVERY; DELAY MANAGEMENT; AIRCRAFT; VEHICLE; OPTIMIZATION; ALGORITHM; MODELS; SYSTEM;
D O I
10.1016/j.ejor.2012.04.025
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper discusses rescheduling of freight train locomotives when dealing with a disrupted situation in the daily operations in Japan. Within the current framework of dispatching processes, passenger railway operators modify the entire timetables and an adjusted freight train timetable is distributed to a freight train operator. For this timetable, we solve the locomotive rescheduling problem by changing the assignment of the locomotives to all the trains and considering their periodic inspections. We then solve the uncovered train detection problem that selects unassigned trains according to their value if the rescheduling phase fails. We formulate the two problems as integer programming problems and solve them by column generation. Our simple speeding-up technique named set-covering relaxation is applied to the rescheduling problem, which has set-partitioning constraints. The column generation subproblem is reduced to a shortest path problem with the inspection constraint and solved in polynomial time. Numerical experiments carried out with a real timetable, locomotive scheduling plan and major disruption data in the area with the highest frequency of freight trains reveal that satisfactory solutions are obtained within 30 second on a PC even for cases with a 72-hour goal for recovery. The set-covering relaxation speeds up the computation time by a factor of eight at a maximum. (c) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:636 / 648
页数:13
相关论文
共 50 条
  • [21] An Automatic Train Operation Based Real-Time Rescheduling Model for High-Speed Railway
    Liu, Fan
    Xun, Jing
    MATHEMATICS, 2023, 11 (21)
  • [22] A multi-task deep reinforcement learning approach to real-time railway train rescheduling
    Tang, Tao
    Chai, Simin
    Wu, Wei
    Yin, Jiateng
    D'Ariano, Andrea
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2025, 194
  • [23] Rescheduling of Cyclical Real-Time Communication.
    von Arnim, Christian
    Riedel, Oliver
    Zeitschrift Kunststofftechnik/Journal of Plastics Technology, 2024, 119 (12): : 924 - 928
  • [24] Train rescheduling for minimizing passenger travel time under disruption for metro lines
    Wang, Dandan
    Wang, Yihui
    Zhu, Songwei
    Meng, Lingyun
    Tang, Tao
    2020 IEEE 16TH INTERNATIONAL CONFERENCE ON CONTROL & AUTOMATION (ICCA), 2020, : 582 - 587
  • [25] Real-time integrated train rescheduling and rolling stock circulation planning for a metro line under disruptions
    Wang, Yihui
    Zhao, Kangqi
    D'Ariano, Andrea
    Niu, Ru
    Li, Shukai
    Luan, Xiaojie
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2021, 152 : 87 - 117
  • [26] Real-time high-speed train rescheduling based on a Human-Computer Interaction framework
    Wenhao Zhu
    Tao Zhang
    Zhipeng Ying
    Zhengwen Liao
    Xiaojie Luan
    Lingyun Meng
    High-speed Railway, 2023, 1 (02) : 130 - 140
  • [27] A Bi-level Real-time Rescheduling Approach for Train Operation in High-speed Railways
    Liu, Fan
    Xun, Jing
    Dong, Hairong
    Zhang, Zixuan
    Li, Yanyan
    2021 IEEE INTELLIGENT TRANSPORTATION SYSTEMS CONFERENCE (ITSC), 2021, : 2417 - 2422
  • [28] Anomaly Detection and Attack Classification for Train Real-Time Ethernet
    Duo, Ruifeng
    Nie, Xiaobo
    Yang, Ning
    Yue, Chuan
    Wang, Yongxiang
    IEEE ACCESS, 2021, 9 : 22528 - 22541
  • [29] REAL-TIME SCHEDULING OF FREIGHT RAILROADS
    KRAAY, DR
    HARKER, PT
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1995, 29 (03) : 213 - 229
  • [30] Application of an iterative framework for real-time railway rescheduling
    Dollevoet, Twan
    Huisman, Dennis
    Kroon, Leo G.
    Veelenturf, Lucas P.
    Wagenaar, Joris C.
    COMPUTERS & OPERATIONS RESEARCH, 2017, 78 : 203 - 217