Impacts of collaborative investment and inspection policies on the integrated inventory model with defective items

被引:20
|
作者
Ouyang, Liang-Yuh [1 ]
Chen, Li-Yuan [2 ]
Yang, Chih-Te [2 ]
机构
[1] Tamkang Univ, Dept Management Sci, Taipei, Taiwan
[2] Chien Hsin Univ Sci & Technol, Dept Ind Management, Tao Yuan, Taiwan
关键词
inventory; integrated model; defective items; capital investment; non-inspect; IMPERFECT PRODUCTION PROCESSES; LOT-SIZE MODEL; PRODUCTION QUANTITY MODEL; PRODUCTION RUN-LENGTH; OPTIMAL BATCH SIZE; QUALITY IMPROVEMENT; PRODUCTION SYSTEM; PRODUCTION CYCLES; JOINT INVESTMENT; SETUP REDUCTION;
D O I
10.1080/00207543.2013.794319
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
For an imperfect production system, to reduce quality-related costs, a manager may consider investing capital in quality improvement. In general, the investment expense in reducing the defective rate of items is often paid by the vendor. On the other hand, the buyer may inspect the product quality as the order is received which implies it incurs an inspection cost. In a supply chain integrated system, to accomplish global optimisation, the vendor and buyer can agree to jointly invest capital to improve the imperfect production processes, and the buyer can remove the inspection programme as the defective rate reaches a certain low-level. Hence, this paper investigates the impacts of collaborative investment and inspection policies on an integrated inventory model with defective items. The objective of this study is to seek the optimal order quantity, shipping times from the vendor to the buyer per production run, and the defective rate that minimise the joint total cost per unit time. An algorithm is developed to find the optimal solution. Several numerical examples are presented to demonstrate the proposed model and solution procedure, and then several management insights are obtained from the numerical examples.
引用
收藏
页码:5789 / 5802
页数:14
相关论文
共 50 条
  • [21] Optimization of fuzzy inventory lot-size with scrap and defective items under inspection policy
    Harish Garg
    Chandrasekaran Sugapriya
    Vadivelu Kuppulakshmi
    Deivanayagampillai Nagarajan
    Soft Computing, 2023, 27 : 2231 - 2250
  • [22] An inventory model for product life cycle with maturity stage and defective items
    C. Krishnamoorthi
    OPSEARCH, 2012, 49 (3) : 209 - 222
  • [23] Technical Note on (Q, r, L) Inventory Model with Defective Items
    Tung, Cheng-Tan
    Wou, Yu-Wen
    Lin, Shih-Wei
    Deng, Peter
    ABSTRACT AND APPLIED ANALYSIS, 2010,
  • [24] An inventory model for product life cycle with maturity stage and defective items
    Krishnamoorthi, C.
    OPSEARCH, 2012, 49 (03) : 209 - 222
  • [25] Production Inventory Model for Two Levels of Production With Defective Items and Shortages
    Sivashankari, C. K.
    2014 INTERNATIONAL CONFERENCE ON INFORMATION COMMUNICATION AND EMBEDDED SYSTEMS (ICICES), 2014,
  • [26] A Single Item Inventory Model with Variable Production Rate and Defective Items
    Patra K.
    Maity R.
    International Journal of Applied and Computational Mathematics, 2017, 3 (Suppl 1) : 19 - 29
  • [27] Continuous review inventory model with a service level constraint and defective items
    Lee, Ding-Wen
    Chuang, Bor-Ren
    JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2009, 12 (01): : 197 - 206
  • [28] Analysis of optimal vendor-buyer integrated inventory policy involving defective items
    Ouyang, Liang-Yuh
    Wu, Kun-Shan
    Ho, Chia-Huei
    International Journal of Advanced Manufacturing Technology, 2006, 29 (11-12): : 1232 - 1245
  • [29] Analysis of optimal vendor-buyer integrated inventory policy involving defective items
    Liang-Yuh Ouyang
    Kun-Shan Wu
    Chia-Huei Ho
    The International Journal of Advanced Manufacturing Technology, 2006, 29 : 1232 - 1245
  • [30] Analysis of optimal vendor-buyer integrated inventory policy involving defective items
    Ouyang, Liang-Yuh
    Wu, Kun-Shan
    Ho, Chia-Huei
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 29 (11-12): : 1232 - 1245