A Bi-Level Approach for the Metro Train Scheduling Problem Considering Passenger Behaviors

被引:0
|
作者
Zhang, Yiyao [1 ]
Yin, Jiateng [1 ]
D'Ariano, Andrea [2 ]
Wang, Yihui [1 ]
机构
[1] Beijing Jiaotong Univ, State Key Lab Rail Traff Control & Safety, Beijing 100044, Peoples R China
[2] Univ Roma Tre, Dept Engn, Rome, Italy
基金
中国国家自然科学基金;
关键词
TIME-DEPENDENT DEMAND; LINE;
D O I
10.1109/ITSC55140.2022.9921779
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In urban rail systems, the performance of a train schedule is directly related to the attractiveness to passengers, since the passengers may choose other transport modes in case of station crowdedness. In this paper, we are devoted to the problem of train scheduling in urban rail systems with consideration of passenger behaviors. Specifically, we construct a bi-level model for this problem, where the upper level optimizes the train schedule as well as train stop-skipping strategies, while the lower level models the choice of passengers given the train schedule from the upper level. An iterative framework is proposed to solve the bi-level model. We carry out the simulation experiment using the actual data of Beijing Metro Line 1. The simulation results show that our bi-level approach can generate a more attractive train schedule that increases the number of traveling passengers by 17.39%.
引用
收藏
页码:2194 / 2199
页数:6
相关论文
共 50 条
  • [21] Modeling truck scheduling problem at a cross-dock facility through a bi-objective bi-level optimization approach
    Heidari, Fateme
    Zegordi, Seyed Hessameddin
    Tavakkoli-Moghaddam, Reza
    JOURNAL OF INTELLIGENT MANUFACTURING, 2018, 29 (05) : 1155 - 1170
  • [22] Modeling truck scheduling problem at a cross-dock facility through a bi-objective bi-level optimization approach
    Fateme Heidari
    Seyed Hessameddin Zegordi
    Reza Tavakkoli-Moghaddam
    Journal of Intelligent Manufacturing, 2018, 29 : 1155 - 1170
  • [23] Collaborative optimization for metro train scheduling and train connections combined with passenger flow control strategy
    Liu, Renming
    Li, Shukai
    Yang, Lixing
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2020, 90
  • [24] Bi-level Problem and SMD Assessment Delinquent for Single Impartial Bi-level Optimization
    Vadali, Srinivas
    Deekshitulu, G. V. S. R.
    Murthy, J. V. R.
    PROCEEDINGS OF SIXTH INTERNATIONAL CONFERENCE ON SOFT COMPUTING FOR PROBLEM SOLVING (SOCPROS 2016), VOL 1, 2017, 546 : 52 - 62
  • [25] A Bi-Level Approach for Networked Microgrid Planning Considering Multiple Contingencies and Resilience
    Oh, Byeong-Chan
    Son, Yeong-Geon
    Zhao, Dongbo
    Singh, Chanan
    Kim, Sung-Yul
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2024, 39 (04) : 5620 - 5630
  • [26] The Game Theory Approach for solving the Hierarchical and Decentralized Bi-Level problem
    Ghotbi, Ehsan
    Dhingra, Anoop K.
    PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, 2013, VOL 12, 2014,
  • [27] Production and work force assignment problem: A bi-level programming approach
    Zhou, Xiaoyang
    Tu, Yan
    Lev, Benjamin
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2015, 10 (01) : 50 - 61
  • [28] A Bi-level Heuristic Solution for the Nurse Scheduling Problem Based on Shift-swapping
    Youssef, Ahmed
    Senbel, Samah
    2018 IEEE 8TH ANNUAL COMPUTING AND COMMUNICATION WORKSHOP AND CONFERENCE (CCWC), 2018, : 72 - 78
  • [29] Gallery type Bi-level passenger cars for North America
    Ito, Y., 1600, Japan Railway Engineers' Association
  • [30] Bi-level scheduling Model of Air conditioning load aggregator considering users' comfort compensation
    Yang Bin
    Chen Zhenyu
    Huo Yao
    Ruan Wenjun
    Zhou Hongquan
    Gao Zhiguo
    2020 5TH ASIA CONFERENCE ON POWER AND ELECTRICAL ENGINEERING (ACPEE 2020), 2020, : 1995 - 2001