Decision Support System for Peak Load Dispatching

被引:0
|
作者
Liu Jin [1 ]
Yu Jilai [1 ]
Liu Zhuo [1 ]
机构
[1] Harbin Inst Technol, Dept Elect Engn, Harbin 150006, Peoples R China
关键词
REGRESSION;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
According to the decision demands from peak load dispatching (PLD) in power system, we develop a decision support system (DSS) for PLD by means of computer technology. In the DSS, we design a platform of data warehouse after data pre-processing, and propose an integration support technique by applying pattern recognition, robust regression and optimal load dispatch approach on the platform. We develop a software system for the DSS to implement the entire peak load dispatch process, and achieve the above all functions automatically. The extracted useful information from large amounts of data may provide the accurate forecasting peak loads and the effective decision-making information of the peak period for the dispatchers and managers of power system. The validity of the designed system for PLD is shown by the simulation results to an actual power system in China.
引用
收藏
页码:103 / 108
页数:6
相关论文
共 50 条
  • [41] Fuzzy decision system model of truck-dispatching in opencast
    Song, Zi-Ling
    Meitan Xuebao/Journal of the China Coal Society, 2004, 29 (SUPPL.):
  • [42] Study on Algorithm of Optimal Decision for Vehicle Dispatching in Emergency System
    Chen, Yueming
    Xiao, Deyun
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 4671 - 4674
  • [43] A DECISION-SUPPORT SYSTEM TO LOAD CONTAINERS TO DOUBLE-STACK RAIL CARS
    PACANOVSKY, DL
    JAHREN, CT
    PALMER, RN
    NEWMAN, RR
    HOWLAND, D
    CIVIL ENGINEERING SYSTEMS, 1995, 11 (04): : 247 - 261
  • [44] Decision-Support System for Effective Management of an Active Filter in a Network with a Conversion Load
    Voronova, A.V.
    Zhilenkov, A.A.
    Demidova, K.A.
    Russian Electrical Engineering, 2022, 93 (06) : 415 - 419
  • [45] Decision-Support System for Effective Management of an Active Filter in a Network with a Conversion Load
    Voronova A.V.
    Zhilenkov A.A.
    Demidova K.A.
    Russian Electrical Engineering, 2022, 93 (6) : 415 - 419
  • [46] DECISION SUPPORT SYSTEM TO SUPPORT DECISION PROCESSES WITH DATA MINING
    Rupnik, Rok
    Kukar, Matjaz
    JOURNAL OF INFORMATION AND ORGANIZATIONAL SCIENCES, 2007, 31 (01) : 217 - 232
  • [47] Dispatching decision model considering reactive power adjustment priority of extensive load aggregators
    Li X.
    Lin Y.
    Liu C.
    He Y.
    Gu D.
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2022, 43 (05): : 67 - 73
  • [48] Investigation of the potential for electric vehicles to support the domestic peak load
    Wang, Yue
    Huang, Sikai
    Infield, David
    2014 IEEE INTERNATIONAL ELECTRIC VEHICLE CONFERENCE (IEVC), 2014,
  • [49] MIXED APPROACH TO FORECASTING PEAK SYSTEM LOAD
    URI, ND
    ELECTRIC POWER SYSTEMS RESEARCH, 1978, 1 (03) : 213 - 223
  • [50] COMPUTER SUPPORT FOR OPERATOR ASSIGNMENT AND DISPATCHING IN AN URBAN TRANSIT SYSTEM
    MARLIN, PG
    NAUSS, RM
    SMITH, LD
    RHOADES, M
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 1988, 22 (01) : 13 - 26