Slope safety control during mining below a landslide

被引:1
|
作者
Min, H [1 ]
Deng, JH
Wei, JB
Zhang, QZ
Zou, JG
Zhou, ZB
机构
[1] Chinese Acad Sci, Inst Rock & Soil Mech, Wuhan 430071, Peoples R China
[2] WISCO, DAye Iron Mine, Daye 425006, Peoples R China
来源
关键词
open pit mine; hanging-wall ore mining; landslide; control measure; retaining wall;
D O I
10.1360/04zze2
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The East Open Pits of Daye Iron Mine were closed in year 2000 and the ore beyond the pit limit was planned to be mined by underground ways. In order to facilitate the smooth transition to underground mining, hanging-wall ores in the old pits were scheduled to be mined. Xiangbishan pit is one of the four mining spots selected. In 1979 when the pit was mined to around 36 m a.s.l., a landside of around 70000 m(3) occurred in its North Slope, leading to the closure of the pit. The pit was then backfilled to 60 m a.s.l. to maintain the slope stability. The hanging-wall ore to be mined is just located below the old slide, so whether the slide will be reactivated and how to control its deformation and stability are the key issues concerned. Based on geological investigation and numerical analysis, it was predicted that the slide would be reactivated and a control measure using the intact ore body as a retaining wall was thus suggested. During mining, displacements were monitored to assure safety. By July, 2003, 383000 tons of ore were successfully mined. Though the observed displacement reached 8795 mm, no major failure happened, The final slope is 110 m high with an angle of 70 degrees.
引用
收藏
页码:47 / 52
页数:6
相关论文
共 50 条
  • [42] Movement and failure law of slope and overlying strata during underground mining
    Lv Xiangfeng
    Zhou Hongyuan
    Wang Zhenwei
    Cai Yue
    JOURNAL OF GEOPHYSICS AND ENGINEERING, 2018, 15 (04) : 1638 - 1650
  • [43] Study of Residual Slope Mining and its Stability during Transition from Open Pit to Underground Mining
    Nan Shiqing
    Guo Xianzhang
    Zhang Juanxia
    DISASTER ADVANCES, 2012, 5 (04): : 110 - 115
  • [44] Technical safety countermeasures during construction of high excavated slope
    Chen, T.
    Renmin Changjiang/Yangtze River, 2001, 32 (08): : 17 - 18
  • [45] RAINFALL-INDUCED SLOPE LANDSLIDE PONTENTIAL AND LANDSLIDE DISTRIBUTION CHARACTERISTICS ASSESSMENT
    Chue, Yung-Sheng
    Chen, Jing-Wan
    Chen, Yie-Ruey
    JOURNAL OF MARINE SCIENCE AND TECHNOLOGY-TAIWAN, 2015, 23 (05): : 705 - 716
  • [46] Dust control during drilling in mining
    Prockat
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1932, 76 : 347 - 348
  • [47] A fluidized landslide on a natural slope by artificial rainfall
    Hirotaka Ochiai
    Yasuhiko Okada
    Gen Furuya
    Yoichi Okura
    Takuro Matsui
    Toshiaki Sammori
    Tomomi Terajima
    Kyoji Sassa
    Landslides, 2004, 1 : 211 - 219
  • [48] A fluidized landslide on a natural slope by artificial rainfall
    Ochiai, Hirotaka
    Okada, Yasuhiko
    Furuya, Gen
    Okura, Yoichi
    Matsui, Takuro
    Sammori, Toshiaki
    Terajima, Tomomi
    Sassa, Kyoji
    LANDSLIDES, 2004, 1 (03) : 211 - 219
  • [49] Interpretation and Analysis of Potential Fluidized Landslide Slope
    Shu, H. M.
    Chen, T. C.
    Yang, W. C.
    Luo, Y. X.
    GEOTECHNICAL ENGINEERING, 2016, 47 (02): : 101 - 111
  • [50] Submarine landslide geomorphology, US continental slope
    McAdoo, BG
    Pratson, LF
    Orange, DL
    MARINE GEOLOGY, 2000, 169 (1-2) : 103 - 136