Workload control Successful implementation taking a contingency-based view of production planning and control

被引:61
|
作者
Hendry, Linda [1 ]
Huang, Yuan [2 ]
Stevenson, Mark [1 ]
机构
[1] Univ Lancaster, Lancaster Univ Management Sch, Dept Management Sci, Lancaster, England
[2] Univ Southampton, Sch Management, Southampton, Hants, England
关键词
Workload control; Implementation strategy; Make-to-order; Production planning and control; Action research; Performance management; MAKE-TO-ORDER; TOTAL QUALITY MANAGEMENT; JUST-IN-TIME; CONTROL WLC; JOB-SHOP; REVIEW/RELEASE; RELEASE; INPUT; APPLICABILITY; METHODOLOGY;
D O I
10.1108/01443571311288057
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - The purpose of this paper is to present a successful implementation of a comprehensive workload control (WLC) concept; and to describe the associated implementation process. Design/methodology/approach - Longitudinal action research using a contingency-based approach to ensure alignment between the case company and the characteristics of the WLC approach; and the resulting expected improvements in performance. A set of 17 issues and responses from the literature is used as a checklist for implementing WLC. Findings - Performance improvements include: reduced lead times; significant improvement in lateness and tardiness; reduced costs; improved internal and external co-ordination; and higher quality. The relevance of 15 of the 17 implementation issues is confirmed along with the same response as in previous research for ten issues and an improved response for five issues. In addition, three new issues are identified and addressed. Research limitations/implications - Dependability was a more important competitive priority in this company than speed; and, therefore, the ability of WLC to reduce lead times was not fully assessed. Practical implications - The importance of a contingency-based approach to production planning and control is confirmed. Comprehensive WLC approaches are closely aligned with the high-variety/low-volume context of make-to-order (MTO) companies. Originality/value - This is the first paper that empirically demonstrates performance improvements resulting from WLC alongside a detailed discussion of the implementation process. Few examples of successful implementations have been published previously, and these tend to treat the implementation process as a "black box". Where more detail on the implementation process has been given in previous studies, evidence of effectiveness in practice was not provided.
引用
收藏
页码:69 / 103
页数:35
相关论文
共 50 条
  • [21] PRODUCTION PLANNING AND CONTROL
    WASCHER, G
    GAUL, W
    OR SPEKTRUM, 1992, 14 (04) : 175 - 175
  • [22] PLANNING FOR PRODUCTION CONTROL
    DEVOS, H
    JOURNAL OF ACCOUNTANCY, 1969, 128 (02): : 82 - 84
  • [23] Production planning and control
    DE SWARDT G
    1971, 11 (05): : 41 - 43
  • [26] Control: The Foundation of Successful Safety Planning
    Hendrickson, Susan W.
    JOURNAL OF HEALTHCARE MANAGEMENT, 2024, 69 (04) : 240 - 243
  • [27] Reflective simulation for on-line workload planning and control
    Revetria, Roberto
    Tonelli, Flavio
    PROCEEDINGS OF THE 2007 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2007, : 1793 - 1798
  • [28] PPC 4.0 – Successful integration of industry 4.0 approaches into production planning and control
    Dombrowski U.
    Sendler M.
    Dix Y.
    Adams T.
    Kaufmann M.
    1600, Carl Hanser Verlag, Kolbergerstrasse 22, Munchen, D-81679, Germany (115): : 8 - 14
  • [29] View on Control through Detailed Planning
    Chen Bing zhao Tongji University
    ChinaCityPlanningReview, 1991, (02) : 28 - 34
  • [30] A Dutch view of emergency planning and control
    Epema, O. J.
    van Steenwijk, J. M.
    van Gogh, W. G.
    Water Contamination Emergencies: Enhancing Our Response, 2006, (302): : 116 - 125