Under the Mode of Project Construction Cost Control

被引:0
|
作者
Gou Jingxiu [1 ]
Lu Jianchang [2 ]
机构
[1] Informat Engn Vocat Coll, Dept Management, Shijiazhuang 050000, Peoples R China
[2] North China Elect Power Univ, Dept Econ Management, Baoding 071003, Peoples R China
关键词
Bidding; Contract; Construction Process; Cost Control;
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The valuation mode of Bill of Quantities will influence specific works and the control targets of engineering costs. "The Bill of Quantities Construction Norms" has a mandatory requirement that all construction projects using state-owned Capital investment or capital investment mainly resulting from state-owned must adopt the bill of quantities from December 1, 2008. Under the new valuation mode, how to control construction cost is an important matter for construction enterprises. In this paper, the authors simply introduce the control methods at different construction stage under the bill of construction mode.
引用
收藏
页码:190 / +
页数:2
相关论文
共 50 条
  • [21] Research on construction project cost budget and cost control based on matrix model
    Yang J.
    Li Z.
    Yang G.
    Applied Mathematics and Nonlinear Sciences, 2024, 9 (01)
  • [22] Study and Realization of Core Calculation and Interactive Mode of Construction Project's Cost and Schedule Dynamic Control System
    Qiao, Haoshuai
    Zhou, Hong
    Su, Li
    Sun, Yi
    PROCEEDINGS OF THE 20TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2017, : 1019 - 1029
  • [23] Qualitative Analysis on the Cost Control and Construction Engineering Project Management
    You Tao
    Yao Zhuo-hong
    Wang Wei
    MATERIALS SCIENCE AND INFORMATION TECHNOLOGY, PTS 1-8, 2012, 433-440 : 1705 - +
  • [24] Holistic cybernetic construction cost control model - project development
    Girmscheid, G.
    BAUINGENIEUR, 2007, 82 : 495 - 503
  • [25] Research on Dynamic Cost Control of Construction Project Based on BIM
    Wang, Yaxi
    PROCEEDINGS OF THE 2017 INTERNATIONAL CONFERENCE ON INNOVATIONS IN ECONOMIC MANAGEMENT AND SOCIAL SCIENCE (IEMSS 2017), 2017, 29 : 167 - 171
  • [26] Monitoring project duration and cost in a construction project by applying statistical quality control charts
    Aliverdi, Reza
    Naeni, Leila Moslemi
    Salehipour, Amir
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (03) : 411 - 423
  • [27] CONSTRUCTION PROJECT COST MANAGEMENT
    Sachek, P., V
    SCIENCE & TECHNIQUE, 2010, (05): : 72 - 78
  • [28] Cost Control System Building Based on Government Investment Construction Project
    Wu, Zhen-quan
    Liu, Fang
    Xu, Xiao-yun
    PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: INNOVATION AND PRACTICE IN INDUSTRIAL ENGINEERING AND MANAGEMENT (VOL 2), 2016, : 695 - 705
  • [29] Research on Target Cost Control of Construction Project based on Goal Programming
    Zhao, H.
    He, G.
    2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 482 - 485
  • [30] The Application of the Whole Process Management in the Green Construction Project of Cost Control
    Li, Jian-Feng
    Zhang, Yuan
    2016 INTERNATIONAL CONFERENCE ON MANAGEMENT, ECONOMICS AND SOCIAL DEVELOPMENT (ICMESD 2016), 2016, : 901 - 906