Mechanical braking system for the pulsed power supply system of ASDEX Upgrade

被引:1
|
作者
Kaesemann, C. -P. [1 ]
Huart, M. [1 ,4 ]
Stobbe, F. [1 ]
Goldstein, I. [1 ]
Sigalov, A. [1 ]
Sachs, E. [2 ]
Perk, E. [3 ]
机构
[1] EURATOM, Max Planck Inst Plasma Phys, D-85748 Garching, Germany
[2] Siemens AG, Ind Automat Syst, D-90475 Nurnberg, Germany
[3] Piper Test & Measurement Ltd, Ashford TN25 7JT, Kent, England
[4] Michel Huart Personal Coaching & Consulting, D-80807 Munich, Germany
关键词
ASDEX Upgrade; Flywheel generator; Power supply; Hydraulic dynamometer;
D O I
10.1016/j.fusengdes.2012.12.021
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
A few years ago, IPP reviewed the safety of the ASDEX Upgrade pulsed power supply system. Two critical sub-systems had been identified: The (electrical) braking system for the flywheel generators and the oil lubrication system for the shaft bearings. A simultaneous failure of these two systems may lead to severe damages and could have consequences for the safety of operating personnel. Therefore a second, independent braking possibility for every generator was stipulated. Especially the challenges adapting a dynamometer, originally designed for motor test benches, towards a plant safety system for generator EZ4 will be described in the paper. Further on, the paper will present the problems, implementing such a system into an existing installation, including the calculation of the required supporting structure, balancing of the extended shaft line and required water cooling and control. Finally it will report on the performance achieved during operation. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:1491 / 1494
页数:4
相关论文
共 50 条
  • [21] The ITER Pulsed Power Supply System
    Mondino, PL
    17TH IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, VOLS 1 AND 2, 1998, : 491 - 496
  • [22] Experience with the ECRH system of ASDEX-Upgrade
    Leuterer, F
    Beckmann, M
    Brinkschulte, H
    Monaco, F
    Münich, M
    Ryter, F
    Schütz, H
    Empacher, L
    Gantenbein, G
    Förster, W
    Kasparek, W
    Schüller, P
    Schwörer, K
    Borchegowski, A
    Fix, A
    Illin, V
    Popov, L
    Sigalaev, V
    Tai, E
    FUSION ENGINEERING AND DESIGN, 2001, 53 : 485 - 489
  • [23] THE TIMING SYSTEM FOR THE ASDEX UPGRADE EXPERIMENT CONTROL
    RAUPP, G
    RICHTER, H
    AUBANEL, C
    BRUHNS, H
    HUBER, R
    SCHRAMM, G
    TRZINSKI, T
    VALLEN, H
    WARMBRAND, A
    ZEHETBAUER, T
    IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 1992, 39 (02) : 198 - 204
  • [24] OPERATION EXPERIENCE WITH THE ASDEX UPGRADE ECRH SYSTEM
    Leuterer, F.
    Muenich, M.
    Brandl, F.
    Brinkschulte, H.
    Gruenwald, G.
    Manini, A.
    Monaco, F.
    Ryter, F.
    Schuetz, H.
    Stober, J.
    Wagner, D.
    Kasparek, W.
    Gantenbein, G.
    Empacher, L.
    Lechte, C.
    Kumric, H.
    Schueller, P.
    Litvak, A.
    Chirkov, A.
    Denisov, G.
    Fix, A.
    Illin, V.
    Malygin, S.
    Miasnikov, V.
    Nichiporenko, V.
    Popov, L.
    Tai, E.
    Zapevalov, V.
    FUSION SCIENCE AND TECHNOLOGY, 2009, 55 (01) : 31 - 44
  • [25] Progress in the new ECRH system for ASDEX upgrade
    Leuterer, F
    Grünwald, G
    Monaco, F
    Münich, M
    Ryter, F
    Schütz, H
    Wagner, D
    Zohm, H
    Franke, T
    Dammertz, G
    Heidinger, H
    Koppenburg, K
    Thumm, M
    Kasparek, W
    Gantenbein, G
    Denisov, GG
    Litvak, A
    Zapevalov, V
    CONFERENCE DIGEST OF THE 2004 JOINT 29TH INTERNATIONAL CONFERENCE ON INFRARED AND MILLIMETER WAVES AND 12TH INTERNATIONAL CONFERENCE ON TERAHERTZ ELECTRONICS, 2004, : 219 - 220
  • [26] ECE system on ASDEX-Upgrade placed inline at the high power waveguide based transmission system
    Bongers, W. A.
    Goede, A. P. H.
    Westerhof, E.
    Oosterbeek, J. W.
    Doelman, N. J.
    Schuller, F. C.
    de Baar, M. R.
    Amerongen, F. J.
    Hennen, B. A.
    Kasparek, W.
    Nuij, P. W. J. M.
    Thoen, D. J.
    Wagner, D.
    Stober, J.
    Steinbuch, M.
    2009 34TH INTERNATIONAL CONFERENCE ON INFRARED, MILLIMETER, AND TERAHERTZ WAVES, VOLS 1 AND 2, 2009, : 590 - +
  • [27] Upgrade of the data acquisition and control system of the ASDEX upgrade microwave reflectometer
    Combo, A.
    Silva, A.
    Varela, P.
    Manso, M.
    Sousa, J.
    Correia, C.
    Varandas, C. A. F.
    IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 2006, 53 (03) : 918 - 922
  • [28] Status and perspectives of the ASDEX Upgrade gas inlet system
    Haertl, Thomas
    Rohde, Volker
    Mertens, Vitus
    FUSION ENGINEERING AND DESIGN, 2015, 96-97 : 265 - 268
  • [29] Design of the shattered pellet injection system for ASDEX Upgrade
    Dibon, M.
    de Marne, P.
    Papp, G.
    Vinyar, I.
    Lukin, A.
    Jachmich, S.
    Kruezi, U.
    Muir, A.
    Rohde, V.
    Lehnen, M.
    Heinrich, P.
    Peherstorfer, T.
    Podymskii, D.
    REVIEW OF SCIENTIFIC INSTRUMENTS, 2023, 94 (04):
  • [30] Beam Quality Measurements at the ASDEX Upgrade ECRH system
    Wagner, D.
    Leuterer, F.
    Plaum, B.
    Schuetz, H.
    Stober, J.
    Thumm, M.
    2024 49TH INTERNATIONAL CONFERENCE ON INFRARED, MILLIMETER, AND TERAHERTZ WAVES, IRMMW-THZ 2024, 2024,