Methodology of Technical Re-Equipment and Modernization of Furnace Structures and Operating Modes

被引:0
|
作者
Druzhinin, G. M. [1 ,2 ]
Ashikhmin, A. A. [1 ]
Maslov, P. V. [1 ]
Popov, A. B. [1 ]
Khammatov, I. M. [1 ]
Loshkarev, N. B. [2 ]
机构
[1] Sci Res Inst Met Heat Engn SRIMHE, Ekaterinburg, Russia
[2] Ural Fed Univ, Ekaterinburg, Russia
关键词
technical re-equipment; modernization; furnace unit; technical inspection; calculation and theoretical analysis; burner devices; temperature and thermal mode; commissioning tests;
D O I
10.1007/s11015-020-01030-8
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
Presently, the furnace stock of the ferrous metallurgy and heavy engineering industry comprises approximately 55%-60% of units with service life over 30-50 years. Considering that constructing new furnaces requires significant financial investments and reduces production over a long period, the technical re-equipment and modernization of units in accordance with modern requirements have become widely adopted. This paper presents an appropriate methodology for the technical re-equipment and modernization, one that enables reducing time and achieving the optimal result with the lowest cost.
引用
收藏
页码:581 / 587
页数:7
相关论文
共 42 条