共 50 条
- [21] A Two-Stage Cournot Duopoly with Inventory Costs The Japanese Economic Review, 1997, 48 : 81 - 89
- [23] TWO-STAGE SUPPLY CHAIN INVENTORY SYSTEM CONSIDERING PRODUCTION POSTPONEMENT AND REWORK INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2017, 24 (05): : 449 - 467