Tropical optimization technique in bi-objective project scheduling under temporal constraints

被引:3
|
作者
Krivulin, Nikolai [1 ]
机构
[1] St Petersburg State Univ, Univ Skaya Nab 7-9, St Petersburg 199034, Russia
基金
俄罗斯基础研究基金会;
关键词
Decision analysis; Multiple criteria evaluation; Max-plus algebra; Tropical optimization; Time-constrained project scheduling;
D O I
10.1007/s10287-020-00374-5
中图分类号
O1 [数学]; C [社会科学总论];
学科分类号
03 ; 0303 ; 0701 ; 070101 ;
摘要
We consider a project that consists of a set of activities performed in parallel under constraints on their start and finish times, including start-finish precedence relationships, release start times, release end times, and deadlines. The problems of interest are to decide on the optimal schedule of the activities to minimize both the maximum flow-time over all activities, and the project makespan. We formulate these problems as bi-objective optimization problems in the framework of tropical mathematics which investigates the theory and applications of algebraic systems with idempotent operations and has various applications in management science and operations research. Then, the use of methods and techniques of tropical optimization allows to derive complete Pareto-optimal solutions of the problems in a direct explicit form ready for further analysis and straightforward computation. We discuss the computational complexity of the solution and give illustrative examples.
引用
收藏
页码:437 / 464
页数:28
相关论文
共 50 条
  • [31] An exact method to solve a Bi-objective Resource Constraint Project Scheduling Problem
    Wan, Xixi
    Dugardin, Frederic
    Yalaoui, Farouk
    IFAC PAPERSONLINE, 2016, 49 (12): : 1038 - 1043
  • [32] A robust bi-objective model for concurrent planning of project scheduling and material procurement
    Tabrizi, Babak H.
    Ghaderi, Seyed Farid
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 98 : 11 - 29
  • [33] Hybrid genetic algorithm for bi-objective resource-constrained project scheduling
    Fikri Kucuksayacigil
    Gündüz Ulusoy
    Frontiers of Engineering Management, 2020, 7 : 426 - 446
  • [34] Hybrid genetic algorithm for bi-objective resource-constrained project scheduling
    Kucuksayacigil, Fikri
    Ulusoy, Gunduz
    FRONTIERS OF ENGINEERING MANAGEMENT, 2020, 7 (03) : 426 - 446
  • [35] The integration of resource allocation and time buffering for bi-objective robust project scheduling
    Liang, Yangyang
    Cui, Nanfang
    Hu, Xuejun
    Demeulemeester, Erik
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (13) : 3839 - 3854
  • [36] Bi-objective resource-constrained project scheduling with robustness and makespan criteria
    Abbasi, Babak
    Shadrokh, Shahram
    Arkat, Jamal
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 180 (01) : 146 - 152
  • [37] A bi-objective robust model for berth allocation scheduling under uncertainty
    Xiang Xi
    Liu Changchun
    Miao Lixin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2017, 106 : 294 - 319
  • [38] AN INTEGRATED BI-OBJECTIVE OPTIMIZATION MODEL AND IMPROVED GENETIC ALGORITHM FOR VEHICLE ROUTING PROBLEMS WITH TEMPORAL AND SPATIAL CONSTRAINTS
    Li, Jiao-Yan
    Hu, Xiao
    Wan, Zhong
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2020, 16 (03) : 1203 - 1220
  • [39] Bi-objective project portfolio selection and staff assignment under uncertainty
    Gutjahr, Walter J.
    Reiter, Peter
    OPTIMIZATION, 2010, 59 (03) : 417 - 445
  • [40] A bi-objective genetic algorithm for intelligent rehabilitation scheduling considering therapy precedence constraints
    Lizhong Zhao
    Chen-Fu Chien
    Mitsuo Gen
    Journal of Intelligent Manufacturing, 2018, 29 : 973 - 988