Assessment of the effluent quality from a gold mining industry in Ghana

被引:25
|
作者
Acheampong, Mike A. [1 ,2 ]
Paksirajan, Kannan [1 ,3 ]
Lens, Piet N. L. [1 ]
机构
[1] UNESCO IHE Inst Water Educ, Dept Environm Engn & Water Technol, Pollut Prevent & Resource Recovery Core, NL-2611 AX Delft, Netherlands
[2] Kumasi Polytech, Dept Chem Engn, Kumasi, Ghana
[3] Indian Inst Technol, Dept Biotechnol, Gauhati 78109, Assam, India
关键词
Cyanide; Heavy metals; Physico-chemical characteristics; Gold mine wastewater; Tailings dam; Principal component analysis; HEAVY-METAL POLLUTION; WASTE-WATER; REMOVAL; SORPTION; CYANIDE; LEAD; MINE; ADSORPTION; EXTRACTION; SEDIMENTS;
D O I
10.1007/s11356-012-1312-3
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The physical and chemical qualities of the process effluent and the tailings dam wastewater of AngloGold-Ashanti Limited, a gold mining company in Ghana, were studied from June to September, 2010. The process effluent from the gold extraction plant contains high amounts of suspended solids and is therefore highly turbid. Arsenic, copper and cyanide were identified as the major pollutants in the process effluent with average concentrations of 10.0, 3.1 and 21.6 mg L-1, respectively. Arsenic, copper, iron and free cyanide (CN-) concentrations in the process effluent exceeded the Ghana EPA discharge limits; therefore, it is necessary to treat the process effluent before it can be discharged into the environment. Principal component analysis of the data indicated that the process effluent characteristics were influenced by the gold extraction process as well as the nature of the gold-bearing ore processed. No significant correlation was observed between the wastewater characteristics themselves, except for the dissolved oxygen and the biochemical oxygen demand. The process effluent is fed to the Sansu tailings dam, which removes 99.9 % of the total suspended solids and 99.7 % of the turbidity; but copper, arsenic and cyanide concentrations were still high. The effluent produced can be classified as inorganic with a high load of non-biodegradable compounds. It was noted that, though the Sansu tailings dam stores the polluted effluent from the gold extraction plant, there will still be serious environmental problems in the event of failure of the dam.
引用
收藏
页码:3799 / 3811
页数:13
相关论文
共 50 条
  • [21] Gold mining and proto-urbanization: recent evidence from Ghana
    Fafchamps, Marcel
    Koelle, Michael
    Shilpi, Forhad
    JOURNAL OF ECONOMIC GEOGRAPHY, 2017, 17 (05) : 975 - 1008
  • [23] A Framework for Reducing Cost of Poor Quality in the Zimbabwean Gold Mining Industry
    Ncube, Nathan
    Tolmay, Aletta Sophia
    van Antwerpen, Sumei
    Journal of Quality, 2024, 31 (04): : 233 - 252
  • [24] Contamination, exposure and risk assessment of mercury in the soils of an artisanal gold mining community in Ghana
    Gyamfi, Opoku
    Sorensen, Peter Borgen
    Darko, Godfred
    Ansah, Eugene
    Vorkamp, Katrin
    Bak, Jesper Leth
    CHEMOSPHERE, 2021, 267
  • [25] An Integrated Assessment Approach to Address Artisanal and Small-Scale Gold Mining in Ghana
    Basu, Niladri
    Renne, Elisha P.
    Long, Rachel N.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2015, 12 (09): : 11683 - 11698
  • [26] THE STATE OF GOLD MINING IN GHANA - AUTHORS REPLY
    MIREKUGYIMAH, D
    TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1993, 102 : A151 - A151
  • [27] GOLD MINING INDUSTRY IN INDIA
    BAGCHI, S
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 1965, 24 (05): : 254 - &
  • [28] Planning for the effective and sustainable management of Ghana's artisanal small-scale gold mining industry
    Wireko-Gyebi, Rejoice Selorm
    Asibey, Michael Osei
    Baah-Ennumh, Theresa Yaaba
    RESOURCES POLICY, 2022, 76
  • [29] Water quality and health risk assessments of illegal gold mining-impacted estuaries in Ghana
    Faseyi, C. A.
    Miyittah, M. K.
    Sowunmi, A. A.
    Yafetto, L.
    MARINE POLLUTION BULLETIN, 2022, 185
  • [30] GHANA EXPANDS ITS DOMESTIC GOLD INDUSTRY
    不详
    E&MJ-ENGINEERING AND MINING JOURNAL, 1988, 189 (05): : 14 - 16