Two-stage chance-constrained unit commitment based on optimal wind power consumption point considering battery energy storage

被引:14
|
作者
Chen, Zhe [1 ]
Li, Zhengshuo [2 ]
Guo, Chuangxin [1 ]
Ding, Yi [1 ]
He, Yubin [3 ]
机构
[1] Zhejiang Univ, Coll Elect Engn, Hangzhou 310027, Peoples R China
[2] Shandong Univ, Sch Elect Engn, Jinan 250061, Peoples R China
[3] Power Dispatching & Control Ctr China Southern Po, Guangzhou 510623, Peoples R China
基金
中国国家自然科学基金; 国家重点研发计划;
关键词
optimisation; iterative methods; wind power plants; power generation dispatch; power generation scheduling; power consumption; battery energy storage; wind power generation; low carbon emissions; wind energy; day-ahead energy; reserve schedules; optimal wind power consumption; optimality-check-only bilinear Benders decomposition; wind utilisation level; two-stage chance-constrained unit commitment; large-scale mixed-integer programming; six-bus system; IEEE 118-bus system; IEEE 236-bus system; ROBUST ENERGY; OPTIMIZATION; TRANSMISSION; UNCERTAINTY;
D O I
10.1049/iet-gtd.2019.1492
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Wind power generation has developed rapidly in recent decades due to low carbon emissions. However, the significant uncertainty makes it uneconomic or even unreliable to be consumed, which hinders the development of wind energy. To guarantee the minimum wind utilisation level without jeopardising system reliability and cost-effectiveness, this study proposes a concept of optimal wind power consumption point. Based on that, a two-stage chance-constrained unit commitment model is presented to co-optimise the day-ahead energy and reserve schedules, which achieves a reasonable trade-off between robustness and costs. The battery energy storage is also investigated to enhance system flexibility and promote wind consumption. The joint chance constraint is dealt with through a sample average approximation method in bilinear forms. The resulting large-scale mixed-integer programming is decomposed into the master and subproblem formulations and then solved iteratively by the developed bilinear Benders decomposition (BBD) method. To achieve computational tractability, several techniques are used to enhance the convergence property of BBD and accelerate the solution process, with a novel optimality-check-only bilinear Benders decomposition method proposed. Case studies on six-bus, IEEE 118-bus and 236-bus systems demonstrate the effectiveness of the proposed model and algorithm.
引用
收藏
页码:3738 / 3749
页数:12
相关论文
共 50 条
  • [21] Optimal HVAC Control for Demand Response via Chance-Constrained Two-Stage Stochastic Program
    Mansy, Hanan
    Kwon, Soongeol
    IEEE TRANSACTIONS ON SMART GRID, 2021, 12 (03) : 2188 - 2200
  • [22] Combination Model of Chance-constrained Security Constraint Unit with Considering the Forecast Uncertainties of DLR and Wind Power
    Yu Z.
    Liu X.
    Yan K.
    Song Y.
    Zhou K.
    Gaodianya Jishu/High Voltage Engineering, 2021, 47 (04): : 1204 - 1213
  • [23] Security-Constrained Unit Commitment With Integration of Battery Storage in Wind Power Plant
    Badakhshan, Sobhan
    Hajibandeh, Neda
    Eshan, Mehdi
    Soleymani, Soodabeh
    2017 IEEE POWER & ENERGY SOCIETY INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE (ISGT), 2017,
  • [24] Chance-constrained Two-stage Energy Hub Cluster Configuration for Integrated Demand Response Considering Multi-energy Load Uncertainty
    Wei, Jingdong
    Zhang, Yao
    Wang, Jianxue
    Wu, Lei
    Li, Qingtao
    2020 IEEE POWER & ENERGY SOCIETY GENERAL MEETING (PESGM), 2020,
  • [25] A NEW UNCERTAIN TWO-STAGE NETWORK DEA MODEL BASED ON CHANCE-CONSTRAINED PROGRAMMING
    Yang, Sijia
    Yangu, Xiangfeng
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2025, 21 (03) : 2032 - 2051
  • [26] Chance-constrained energy management for pumped storage hydropower plant to compensate for wind power uncertainties
    Li, Yang
    Wu, Feng
    Li, Jingyan
    Yin, Yiwu
    Li, Zhiyi
    Ai, Lan
    2021 IEEE POWER & ENERGY SOCIETY GENERAL MEETING (PESGM), 2021,
  • [27] Capacity expansion planning for wind power and energy storage considering hourly robust transmission constrained unit commitment
    Zhou, Yuzhou
    Zhai, Qiaozhu
    Yuan, Wei
    Wu, Jiang
    APPLIED ENERGY, 2021, 302
  • [28] A NEW UNCERTAIN TWO-STAGE NETWORK DEA MODEL BASED ON CHANCE-CONSTRAINED PROGRAMMING
    Yang, Sijia
    Yang, Xiangfeng
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2024, 21 (03) : 2032 - 2051
  • [29] A two-stage stochastic unit commitment considering demand-side provider and wind power penetration from the ISO point of view
    Mahrou Pouladkhay
    Maziar Mirhosseini Moghaddam
    Alireza Sahab
    Electrical Engineering, 2024, 106 : 295 - 314
  • [30] A two-stage stochastic unit commitment considering demand-side provider and wind power penetration from the ISO point of view
    Pouladkhay, Mahrou
    Moghaddam, Maziar Mirhosseini
    Sahab, Alireza
    ELECTRICAL ENGINEERING, 2024, 106 (01) : 295 - 314