Masonry Veneer Investigation in Transitional Construction Restoration

被引:0
|
作者
Thompson, Michel [1 ]
Manglitz, Julia Mathias [2 ]
Kelley, K. Vance [2 ]
机构
[1] ZFI Engn, Oklahoma City, OK 73139 USA
[2] TreanorHL, Denver, CO USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Large stone veneer restoration projects for buildings designed and built in America's "transitional" phase (approximate to 1900-1950) require a clear understanding of as-built conditions even when documentation is available. Evaluation is essential in transitional construction that combines bypass veneer and load-bearing components. The cross-discipline nature of the building's stone demands a collaborative effort to decipher, diagnose, and develop needed repairs. The design-build team used the initial investigation at the Oklahoma State Capitol to assess a variety of limestone anchorages from the original construction: stone-to-stone, stone-to-backup, and stability and erection aids. In some instances, anchors were not indicated on original documentation, while others differed significantly from the original drawings and specifications. The design-build team used explorations with non-destructive and semi-destructive evaluations in conjunction with original documentation and historical photos to develop repairs that met the project's scope priority and budgeting guidelines.
引用
收藏
页码:99 / 110
页数:12
相关论文
共 50 条
  • [31] A PROVISIONAL RESTORATION TECHNIQUE FOR LAMINATE VENEER PREPARATIONS
    ELLEDGE, DA
    HART, JK
    SCHORR, BL
    JOURNAL OF PROSTHETIC DENTISTRY, 1989, 62 (02): : 139 - 142
  • [32] Restoration of historic brick masonry
    Haney, C.K.
    Construction Specifier, 2001, 54 (03):
  • [33] LAMINATE VENEER RESTORATION OF PERMANENT INCISOR TEETH
    FAUNCE, FR
    JOURNAL OF DENTAL RESEARCH, 1977, 56 : A175 - A175
  • [34] Restoration of masonry arch bridges
    Wilmers, Wilhelm
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2012, 165 (03) : 135 - 146
  • [35] Restoration of historic gypsum masonry
    Eckart, Angela
    Burkert, Toralf
    ce/papers, 2023, 6 (06) : 1412 - 1420
  • [36] CLEANING THE CARNEGIE + MASONRY RESTORATION
    DENCLER, J
    SELWYN, J
    PROGRESSIVE ARCHITECTURE, 1990, 71 (10): : 38 - 41
  • [37] Impact of corrosion on the tensile capacity of masonry veneer wall ties
    Terry, Lyndsey
    Gillogly, Grace
    Chaves, Igor
    Masia, Mark
    Petersen, Robert
    AUSTRALIAN JOURNAL OF STRUCTURAL ENGINEERING, 2025, 26 (01) : 46 - 54
  • [38] The Evolution of Stone Masonry Veneer Requirements: Past, Present, and Future
    Civitillo, John M., Jr.
    Peterson, J. Eric
    MASONRY 2018, 2018, 1612 : 123 - 130
  • [39] MASONRY CONSTRUCTION OPERATIONS
    GRIMM, CT
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1974, 100 (NCO2): : 171 - 185
  • [40] Literature in Masonry Construction
    Aberdeen's Magazine of Masonry Construction, 1997, 10 (07):