A Particle Swarm Optimization Based on Priority Rule for Resource-Constrained Multi-Project Scheduling Problem

被引:4
|
作者
Deng Lin-yi [1 ,2 ]
Wang Yun-long [2 ]
Lin Yan [2 ]
机构
[1] Dalian Univ Technol, Dept Comp, Dalian 116024, Peoples R China
[2] Dalian Univ Technol, Ship CAD Engn Ctr, Dalian 116024, Peoples R China
关键词
Particle swarm optimization; Project scheduling; Resource-constrained; Priority rule;
D O I
10.1109/CCDC.2008.4597470
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, we consider the resource-constrained multi-project scheduling problem (RCMPSP) and makespan minimization as objective. We present a new particle swarm optimization (PSO) approach to solve this problem. The particle representation is based on priority rules. The potential solution to the RCMPSP is, i.e., a sequence of priority rules deciding the order of scheduling the non-dummy activities, is represented by the multidimensional particle position. Hence PSO is applied to search the optimal schedule for the RCMPSP, in which a serial schedule generate scheme is adopted to transform the particle-represented priority rule to a schedule. Computational analyses are represented to verify the effective of the proposed methodology.
引用
收藏
页码:1038 / +
页数:2
相关论文
共 50 条
  • [31] Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem
    Kannimuthu, Marimuthu
    Raphael, Benny
    Ekambaram, Palaneeswaran
    Kuppuswamy, Ananthanarayanan
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (04) : 893 - 916
  • [32] An Efficient Discrete Particle Swarm Optimization for Solving Multi-mode Resource-constrained Project Scheduling Problem
    Cui, Jianshuang
    Yu, Liruoyang
    2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 858 - 862
  • [33] On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem
    Wang, Yanting
    He, Zhengwen
    Kerkhove, Louis-Phillipe
    Vanhoucke, Mario
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 114 : 223 - 234
  • [34] Two-stage algorithm for resource-constrained multi-project scheduling problem
    Chen J.-J.
    Tong S.-R.
    Ye Z.-G.
    Zhang J.-W.
    Wang Y.
    Nie Y.-F.
    Zhang Y.-Q.
    Chen, Jun-Jie (junjiechen75@nwpu.edu.cn), 2013, Northeast University (35): : 2013 - 2020
  • [35] A-Team Solving Distributed Resource-Constrained Multi-Project Scheduling Problem
    Jedrzejowicz, Piotr
    Ratajczak-Ropel, Ewa
    VIETNAM JOURNAL OF COMPUTER SCIENCE, 2019, 6 (04) : 423 - 437
  • [36] A-Team Solving Distributed Resource-Constrained Multi-project Scheduling Problem
    Jedrzejowicz, Piotr
    Ratajczak-Ropel, Ewa
    COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2018, PT II, 2018, 11056 : 243 - 253
  • [37] Particle swarm optimization for multi resource constrained project scheduling problem with varying resource levels
    Joy, Jiby
    Rajeev, Srijith
    Abraham, Eldhose C.
    MATERIALS TODAY-PROCEEDINGS, 2021, 47 : 5125 - 5129
  • [38] Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling
    Van Eynde, Rob
    Vanhoucke, Mario
    JOURNAL OF SCHEDULING, 2020, 23 (03) : 301 - 325
  • [39] Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling
    Rob Van Eynde
    Mario Vanhoucke
    Journal of Scheduling, 2020, 23 : 301 - 325
  • [40] Particle swarm optimization for resource-constrained project scheduling problems with activity splitting
    Deng, Lin-Yi
    Lin, Yan
    Kongzhi yu Juece/Control and Decision, 2008, 23 (06): : 681 - 684