Life cycle assessment of heated apron pavement system operations

被引:15
|
作者
Shen, Weibin [1 ]
Ceylan, Halil [2 ]
Gopalakrishnan, Kasthurirangan [3 ]
Kim, Sunghwan [4 ]
Taylor, Peter C. [5 ]
Rehmann, Chris R. [6 ]
机构
[1] Iowa State Univ, Dept Civil Construct & Environm Engn, 24 Town Engn Bldg, Ames, IA 50011 USA
[2] Iowa State Univ, Dept Civil Construct & Environm Engn, 406 Town Engn Bldg, Ames, IA 50011 USA
[3] Iowa State Univ, Dept Civil Construct & Environm Engn, 354 Town Engn Bldg, Ames, IA 50011 USA
[4] Iowa State Univ, Inst Transportat, 24 Town Engn Bldg, Ames, IA 50011 USA
[5] Iowa State Univ, Natl Concrete Pavement Technol Ctr, Ames, IA 50011 USA
[6] Iowa State Univ, Dept Civil Construct & Environm Engn, 482B Town Engn Bldg, Ames, IA 50011 USA
关键词
Greenhouse gas; Energy; Pavements; Snow and ice; Heating; Sustainability;
D O I
10.1016/j.trd.2016.08.006
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Heated pavement systems (HPS) offer an attractive alternative to the cumbersome process of removing ice and snow from airport pavements using traditional snow removal systems. Although snow and ice removing efficiency and economic benefits of HPS have been assessed by previous studies, their environmental impact is not well known. Airport facilities offering public or private services need to evaluate the energy consumption and global warming potential of different types of snow and ice removal systems. Energy usage and emissions from the operations of hydronic heated pavement system using geothermal energy (HHPS-G), hydronic HPS using natural gas furnace (HHPS-NG), electrically heated pavement system (EHPS), and traditional snow and ice removal system (TSRS) are estimated and compared in this study using a hybrid life cycle assessment (LCA). Based on the system models assessed in this study, HPS application in the apron area seems to be a viable option from an energy or environmental perspective to achieve ice/snow free pavement surfaces without using mechanical or chemical methods. TSRS methods typically require more energy and they produce more greenhouse gas (GHG) emissions compared to HPS during the operation phase, under the conditions and assumptions considered in this study. Also, HPS operations require less energy and have less GHG emissions during a snow event with a smaller snowfall rate and a larger snow duration. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:316 / 331
页数:16
相关论文
共 50 条
  • [31] Life Cycle Assessment of Concrete Pavement Rehabilitation: A Romanian Case Study
    Plescan, Costel
    Barta, Melinda
    Maxineasa, Sebastian George
    Plescan, Elena-Loredana
    APPLIED SCIENCES-BASEL, 2022, 12 (04):
  • [32] Life cycle assessment and life cycle cost analysis of recycled solid waste materials in highway pavement: A review
    Li, Jin
    Xiao, Feipeng
    Zhang, Lanfang
    Amirkhanian, Serji N.
    JOURNAL OF CLEANER PRODUCTION, 2019, 233 : 1182 - 1206
  • [33] Model of environmental life cycle assessment for coal mining operations
    Burchart-Korol, Dorota
    Fugiel, Agata
    Czaplicka-Kolarz, Krystyna
    Turek, Marian
    SCIENCE OF THE TOTAL ENVIRONMENT, 2016, 562 : 61 - 72
  • [34] Comprehensive Life Cycle Environmental Assessment of Preventive Maintenance Techniques for Asphalt Pavement
    Zheng, Mulian
    Chen, Wang
    Ding, Xiaoyan
    Zhang, Wenwu
    Yu, Sixin
    SUSTAINABILITY, 2021, 13 (09)
  • [35] Life Cycle Assessment (LCA) of Alternative Pavement Rehabilitation Solutions: A Case Study
    Plati, Christina
    Tsakoumaki, Maria
    SUSTAINABILITY, 2023, 15 (03)
  • [36] Life Cycle Assessment of Aggregate Quarry By-Product Fines in Pavement Applications
    Qamhia, Issam I. A.
    Tutumluer, Erol
    Ozer, Hasan
    SUSTAINABILITY, 2023, 15 (13)
  • [37] Importance of co-product allocation method in pavement life cycle assessment
    Huang, Yue
    Spray, Alan
    Parry, Tony
    INTERNATIONAL SYMPOSIUM ON LIFE CYCLE ASSESSMENT AND CONSTRUCTION: CIVIL ENGINEERING AND BUILDINGS, 2012, 86 : 344 - 351
  • [38] Life Cycle Assessment of Rubber Modified Asphalt Pavement in Michigan: A Case Study
    Xin, Kai
    Jin, Dongzhao
    Handler, Robert M.
    You, Zhanping
    PAVEMENT, ROADWAY, AND BRIDGE LIFE CYCLE ASSESSMENT 2024, ISPRB LCA 2024, 2024, 51 : 220 - 233
  • [39] Integrated life cycle assessment of permeable pavement: Model development and case study
    Liu, Jiawen
    Li, Hui
    Wang, Yu
    Zhang, Hengji
    TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT, 2020, 85
  • [40] Flexible pavement performance and life cycle assessment incorporating climate change impacts
    Blaauw, Sheldon A.
    Maina, James W.
    Mturi, Georges A. J.
    Visser, Alex T.
    TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT, 2022, 104