Integrated risk assessment for oil and gas installations in sensitive areas

被引:29
|
作者
Bucelli, Marta [1 ,2 ]
Paltrinieri, Nicola [2 ]
Landucci, Gabriele [3 ]
机构
[1] Alma Mater Studiorum Univ Bologna, LISES Dipartimento Ingn Civile Chim Ambientale &, Via Terracini 28, I-40131 Bologna, Italy
[2] Norwegian Univ Sci & Technol NTNU, Dept Mech & Ind Engn, N-7491 Trondheim, Norway
[3] Univ Pisa, Dipartimento Ingn Civile & Ind, Largo Lucio Lazzarino 2, I-56126 Pisa, Italy
关键词
Risk barometer; Oil spill risk assessment; Safety barriers; Harsh environment; Sensitive areas; OFFSHORE OIL; DESIGN; SIMULATION; MODELS; QRA; FREQUENCIES; OPERATIONS; SYSTEMS; PORT;
D O I
10.1016/j.oceaneng.2017.12.035
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
Oil and gas installations in sensitive areas with harsh environmental conditions may require improved risk management. Intensified monitoring, assessment and mitigation of risk on a (quasi-) real time basis would advantage not only the operators, but also the surrounding environment. A systematic tool for continuous quantitative evaluation of safety and environmental issues is still lacking. The present work introduces a novel methodology for the integrated assessment of human and environmental risk. A dynamic perspective is adopted to systematically consider the performance of safety barriers. Environmental risk is further investigated by using the risk matrix approach, which evaluates both frequency and severity of oil spill. The methodology is applied to the case of a real oil platform in the Barents Sea. A set of simulations on how the platform is conducted demonstrated that the proposed method may be suitable for risk analysis in such critical conditions. It also showed that dynamic risk assessment may allow identifying critical safety barrier elements, whose correct performance needs to be prioritized to control risk. This is also supported by environmental risk assessment, showing that further safety measures may be considered for biological and environmental conservation.
引用
收藏
页码:377 / 390
页数:14
相关论文
共 50 条
  • [21] Desertification risk assessment in Turkey based on environmentally sensitive areas
    Uzuner, Caglar
    Dengiz, Orhan
    ECOLOGICAL INDICATORS, 2020, 114 (114)
  • [22] Integrated Safety Risk Assessment Between Enterprises, Industries and Areas
    Zhang, Lu
    Luo, Yun
    Liao, Rui
    INTELLIGENT HUMAN SYSTEMS INTEGRATION 2020, 2020, 1131 : 1101 - 1106
  • [23] An integrated fuzzy-FMEA risk assessment approach for reinforced concrete structures in oil and gas industry
    Mohammed, Awsan
    Ghaithan, Ahmed
    Al-Yami, Fahad
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2023, 44 (01) : 1129 - 1151
  • [24] LEGIONELLA RISK ASSESSMENT IN WATER INSTALLATIONS
    Pastor Perez, Paulino
    REVISTA DE SALUD AMBIENTAL, 2005, 5 (02) : 157 - 166
  • [25] Overvoltage risk assessment of electrical installations
    Procjena rizika od prenapona u električnim instalacijama
    Mateković, I., 1600, Hrvatske Elektroprivrede (52):
  • [26] An allision risk model for passing vessels and offshore oil and gas installations on the Norwegian Continental Shelf
    Hassel, Martin
    Utne, Ingrid Bouwer
    Vinnem, Jan Erik
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2021, 235 (01) : 17 - 32
  • [27] An improved method for quantitative risk assessment of unconfined offshore installations subjected to gas explosions
    Xu, Yuxin
    Bai, Yong
    Paik, Jeom Kee
    Dai, Weishun
    STRUCTURES, 2020, 25 : 566 - 577
  • [28] RISK ASSESSMENT OF OFFSHORE OIL AND GAS ACTIVITIES IN THE NETHERLANDS
    HENRIQUEZ, LR
    MARINE POLLUTION BULLETIN, 1994, 29 (6-12) : 317 - 322
  • [29] Fuzzy risk assessment of oil and gas offshore wells
    Lavasani, S. M. Miri
    Yang, Z.
    Finlay, J.
    Wang, J.
    PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2011, 89 (05) : 277 - 294
  • [30] Quantitative risk assessment of the natural gas pipelines in upgraded areas
    Zhou Y.
    Zhang Z.
    Tian S.
    Natural Gas Industry, 2018, 38 (02) : 112 - 118