ASSESSMENT OF ECONOMIC EFFICIENCY AND RISK OF THE PROJECT USING SIMULATION

被引:26
|
作者
Janekova, J. [1 ]
Fabianova, J. [2 ]
Fabian, M. [3 ]
机构
[1] Tech Univ Kosice, Fac Mech Engn, Inst Management Ind & Digital Engn, Pk Komenskeho 9, Kosice 04200, Slovakia
[2] Tech Univ Kosice, Fac Min Ecol Proc Control & Geotechnol, Inst Logist, Letna 9, Kosice 04200, Slovakia
[3] Tech Univ Kosice, Dept Automot Prod, Masiarska 74, Kosice 04200, Slovakia
关键词
Project Management; Post-Audit; Risk Analysis; Monte Carlo Simulation; MONTE-CARLO-SIMULATION; FAULT-TREE ANALYSIS; MEASUREMENT UNCERTAINTY; INVESTMENT PROJECT; MANAGEMENT; IMPROVEMENT;
D O I
10.2507/IJSIMM18(2)467
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The article aimed to present an approach to assessment of economic efficiency and risk of the investment project using Monte Carlo simulation. In this case study, post-audit was presented after 4th year of investment operation. A multilevel post-audit was conducted by combining economic efficiency assessment and the Monte Carlo simulation technique. In the first phase, the most serious factors causing Discounted Economic Value Added (DEVA) deviation from the planned value were identified. In the second step, the correction of the selected input variables, and calculation of the corrected indicator DEVA were performed. The third step was forecasting the DEVA indicator conducted by Monte Carlo simulation. Simulation results were used for assessing the critical factors and their impacts on the DEVA indicator. In the end, on the basis of analyses, calculations and simulations, the results were compared, and the relevance of the presented methodology for practice was discussed.
引用
收藏
页码:242 / 253
页数:12
相关论文
共 50 条
  • [31] Assessment of economic efficiency of hydrogen production using wind and solar energy
    Marchenko, O. V.
    Solomin, S. V.
    BULLETIN OF THE TOMSK POLYTECHNIC UNIVERSITY-GEO ASSETS ENGINEERING, 2025, 336 (01): : 80 - 87
  • [32] Assessment of economic crime risk factors in the ownership structure of companies: results of the Datacros project
    Loknar, Maja
    Dobovsek, Bojan
    REVIJA ZA KRIMINALISTIKO IN KRIMINOLOGIJO, 2022, 73 (01): : 79 - 81
  • [33] Study on the efficiency of project risk management
    Bi Xing
    Zhang Guangliang
    Wang Xinfeng
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE OF MANAGEMENT SCIENCE AND INFORMATION SYSTEM, VOLS 1-4, 2009, : 408 - 412
  • [34] AN ECONOMIC SIMULATION OF RISK EFFICIENCY AMONG ALTERNATIVE DOUBLE-CROP MACHINERY SELECTIONS
    WETZSTEIN, ME
    EDWARDS, DM
    MUSSER, WN
    MCCLENDON, RW
    GEORGIA AGRICULTURAL EXPERIMENT STATION RESEARCH BULLETIN, 1986, (342): : 1 - 41
  • [35] Risk Management in Construction Project Using Agent-Based Simulation
    Taillandier, Franck
    Taillandier, Patrick
    Communications in Computer and Information Science, 2014, 430 : 34 - 43
  • [36] Risk Management in Construction Project Using Agent-Based Simulation
    Taillandier, Franck
    Taillandier, Patrick
    HIGHLIGHTS OF PRACTICAL APPLICATIONS OF HETEROGENEOUS MULTI-AGENT SYSTEMS: THE PAAMS COLLECTION, 2014, 430 : 34 - 43
  • [37] Simulation Model for Biogas Project Efficiency Maximization
    Nurgaliev, T.
    Koshelev, V
    Mueller, J.
    BIOENERGY RESEARCH, 2023, 16 (02) : 1084 - 1098
  • [38] Simulation Model for Biogas Project Efficiency Maximization
    T. Nurgaliev
    V. Koshelev
    J. Müller
    BioEnergy Research, 2023, 16 : 1084 - 1098
  • [39] Monte Carlo simulation-based economic risk assessment in energy communities
    Maggauer, Klara
    Fina, Bernadette
    ENERGY REPORTS, 2025, 13 : 987 - 1003
  • [40] Assessment of the efficiency of educational project management using neuro-fuzzy system
    Krichevsky, Mikhail
    Bydagov, Artyr
    Martynova, Julia
    INTERNATIONAL SCIENCE CONFERENCE SPBWOSCE-2018: BUSINESS TECHNOLOGIES FOR SUSTAINABLE URBAN DEVELOPMENT, 2019, 110