Risk-based asset management in heat recovery steam generators

被引:0
|
作者
Knowles, D. M. [1 ]
Thomas, C. W. [1 ]
机构
[1] MPT Solut, Lower Hutt, New Zealand
关键词
heat recovery steam generators; risk assessment;
D O I
10.3184/096034007X267817
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A risk based inspection and asset management process has been implemented on a number of HRSGs for a client in Australasia. This process has been undertaken in a phased approach consisting of data gathering on site, detailed risk assessment of all critical items of static plant, risk calculation and implementation of a risk based inspection plan based upon the results of the prior aspects of the assessment. The project has been streamlined through the use of dedicated risk based asset management software, RMS, developed specifically for the tasks described. Following the programme of work major inspections have been undertaken, the results of which have been uploaded to the program to allow a subsequent detailed review of the new plant profile and hence risk reduction. This not only allows a clear report on progress to senior management, but ensures that the process is continually maintained and future maintenance is most efficiently deployed to ensure optimum plant efficiency. Furthermore the rigorous nature of the process and the traceability which it enforces is being used to apply for extension of mandatory inspection of pressure vessels, where appropriate, allowing longer run times for the plant such that major shutdowns can be aligned with the requirements of the gas turbine overhauls.
引用
收藏
页码:315 / 322
页数:8
相关论文
共 50 条
  • [41] Advanced Exergy-Based Audit of Heat Recovery Steam Generators: A Case Study
    Sohrabi, Arvin
    Behbahaninia, Ali
    Sayadi, Saeed
    Banifateme, Mohsen
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2022, 144 (01):
  • [42] Development for Vertical Heat Recovery Steam Generators with Natural Circulation
    Pleshanov, Konstantin Aleksandrovich
    Sterkhov, Kirill Vladimirovich
    Khokhlov, Dmitry Aleksandrovich
    Zaichenko, Mikhail Nikolaevitch
    Euroheat and Power (English Edition), 2019, 16 (01): : 12 - 17
  • [43] EFFECTIVE USE OF HEAT-RECOVERY STEAM-GENERATORS
    GANAPATHY, V
    CHEMICAL ENGINEERING, 1993, 100 (01) : 102 - 106
  • [44] A general method for the optimum design of heat recovery steam generators
    Franco, Alessandro
    Giannini, Nicola
    ENERGY, 2006, 31 (15) : 3342 - 3361
  • [45] Sensitivity studies of flow stability of heat recovery steam generators
    Ngoma, D
    Loth, R
    BWK, 2002, 54 (1-2): : 61 - 61
  • [46] Performance simulation of heat recovery steam generators in a cogeneration system
    Karthikeyan, R
    Hussain, MA
    Reddy, BV
    Nag, PK
    INTERNATIONAL JOURNAL OF ENERGY RESEARCH, 1998, 22 (05) : 399 - 410
  • [47] Risk-based management
    不详
    MATERIALS PERFORMANCE, 1999, 38 (02) : 12 - 12
  • [48] Strategic Integration of Risk-Based Asset Management to Improve Large-Diameter Pipelines
    Wade, Mark G.
    PIPELINES 2016 - OUT OF SIGHT, OUT OF MIND, NOT OUT OF RISK, 2016, : 1830 - 1838
  • [49] A Risk-Based Structural Assessment Approach for Port Metro Vancouver's Asset Management
    Ghalibafian, Houman
    Quiroz, Laura
    St Michel, Gary
    Mofrad, Mo
    PORTS 2016: PORT ENGINEERING, 2016, : 677 - 686
  • [50] Risk-Based Prioritization of Sewer Pipe Inspection from Infrastructure Asset Management Perspective
    Lee, Jeonghun
    Park, Chan Young
    Baek, Seungwon
    Han, Seung H.
    Yun, Sungmin
    SUSTAINABILITY, 2021, 13 (13)