BIM Technology Application in the Exploration of Super High-rise Office Building Project in Civil Construction

被引:0
|
作者
Li, Yufeng [1 ]
Gao, Zheng [2 ]
Zhang, Xiaofeng [3 ]
机构
[1] 2 Ganping Rd, Guiyang, Peoples R China
[2] 9 Kechuangsijie Rd, Beijing, Peoples R China
[3] 9 Wuxianbei Rd, Wuhan, Peoples R China
关键词
BIM; 5D virtual technology; Collision detection; Zero yard; Deepening; INFORMATION MODEL;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Guangzhou Pearl River New City J2-5 project east faces Xian Cun Road, south close to the Ritz Carlton Hotel, west close to Guangzhou East Tower, and north close to Global Metroplaza. It uses BIM technology to deepen its work for the construction drawings and construction program to previously find and solve the problems existing in the construction, make full use of external conditions and resources, exchange the traditional site processing template, steel, masonry and other professional engineering into field processing, solve narrow space, achieve the bulk material piled up, processing and other issues, ensuring project quality, safety, duration, benefit and other major control objectives.
引用
收藏
页码:269 / 272
页数:4
相关论文
共 50 条
  • [21] Progress in study of concrete pumping construction techniques in super high-rise building
    South China University of Technology, Guangzhou, Guangdong, 510640, China
    不详
    Key Eng Mat, 2009, (110-116):
  • [22] A Review of Key Technologies Development of Super High-Rise Building Construction in China
    Gong, Jian
    Fang, Tingchen
    Zuo, Junqing
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [23] Patent analysis for forecasting promising technology in high-rise building construction
    Cho, Han Pil
    Lim, Hyunsu
    Lee, Dongmin
    Cho, Hunhee
    Kang, Kyung-In
    TECHNOLOGICAL FORECASTING AND SOCIAL CHANGE, 2018, 128 : 144 - 153
  • [24] Design and Implementation of Green Construction Scheme for a High-rise Residential Building Project
    Zhou, Yong
    Huang, You Zhen
    2018 4TH INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING (ICEMEE 2018), 2018, 38
  • [25] Simulation of Fire Evacuation in a High-Rise Office Building
    Bai, W.
    Huo, Y.
    Zou, G. W.
    Gao, Y.
    2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 1704 - 1708
  • [26] Modelling the evacuation of a high-rise office building in Istanbul
    Oven, V. A.
    Cakici, N.
    FIRE SAFETY JOURNAL, 2009, 44 (01) : 1 - 15
  • [27] Energy saving potential for a high-rise office building
    Bagci, Baris
    INTELLIGENT BUILDINGS INTERNATIONAL, 2009, 1 (02) : 156 - 163
  • [28] DIFFICULTIES AND ISSUES IN SIMULATION OF A HIGH-RISE OFFICE BUILDING
    Anh, Ki-Uhn
    Kim, Young-Jin
    Kim, Deuk-Woo
    Yoo, Sung-Hwan
    Park, Cheol-Soo
    BUILDING SIMULATION 2013: 13TH INTERNATIONAL CONFERENCE OF THE INTERNATIONAL BUILDING PERFORMANCE SIMULATION ASSOCIATION, 2013, : 824 - 831
  • [29] Application of conditional mean spectrum on super high-rise building in soft soils
    Xu L.-Y.
    Zhou Z.-G.
    Gongcheng Lixue/Engineering Mechanics, 2021, 38 : 228 - 236
  • [30] Distribution Technique of Green Material List for High-Rise Building Engineering in BIM Technology
    Shi, Xiaoxing
    Wang, Li
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022