Application Research of the Improved Overall Temporal and Spatial Economic Operation Model Based on Information Entropy in Large-Scale Hydropower Station

被引:7
|
作者
Yang, Liu [1 ]
Yang, Kan [1 ]
Chen, Lei [2 ]
机构
[1] Hohai Univ, Coll Hydrol & Water Resources, Nanjing 210098, Jiangsu, Peoples R China
[2] Fujian Prov Invest Design & Res Inst Water Conser, Fuzhou 350000, Fujian, Peoples R China
关键词
Ant colony optimization; Hydropower station; Inner-plant economical operation; Unit commitment; Informationentropy; Inspiringfactor; Load distribution; Optimal distribution table; UNIT COMMITMENT PROBLEM; PARTICLE SWARM OPTIMIZATION; ANT COLONY OPTIMIZATION; DIFFERENTIAL EVOLUTION; GENETIC ALGORITHM; LOAD DISPATCH; PLANT;
D O I
10.1007/s11269-018-1938-0
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
For the high dimensional and complex inner-plant economical operation problem of large hydropower station, an improved ant colony optimization with adaptive ability, inspiring ability and local search ability was proposed. Spatial optimal load distribution model and temporal unit commitment model was combined into an overall temporal and spatial economic operation model, in which an innovative ant colony model of multiple ant colonies, multiple outsets and multiple routes was adopted. Information entropy was applied to adjust the path selection strategy and pheromone updating strategy of ant colonies along with the change of its value during the iteration. Two inspiring factors were applied in the algorithm to guide the ant colonies to search for optimal paths in a more efficient and targeted way. Local search ability was guaranteed by local translation of unit start-stop points of the optimal solution in each iteration. In the optimal load distribution model, optimal distribution table was set in advance using dynamic programming, which only took account of the stable operation regions and avoided the cavitation and vibration areas for the security and stability of units. The proposed method is applied to the Three Gorges Hydroelectric plant. Compared with other methods under different water heads, this method shows optimized result under the premise of both calculation speed and stability.
引用
收藏
页码:2437 / 2456
页数:20
相关论文
共 50 条
  • [31] Train operation and dispatching system for railway large-scale passenger station based on component technology
    School of Traffic and Transportation, Southwest Jiaotong University, Chengdu 610031, China
    Zhongguo Tiedao Kexue/China Railway Science, 2008, 29 (03): : 122 - 127
  • [32] Research on Application of Project Information Portal in Large-scale Tobacco Construction Project
    Sun, Jide
    Wang, Dawei
    INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 1401 - 1404
  • [33] Improved operation of a large-scale blast furnace using a hybrid dynamic model based optimizing control scheme
    Azadi, Pourya
    Elwan, Hossam
    Klock, Rainer
    Engell, Sebastian
    JOURNAL OF PROCESS CONTROL, 2023, 129
  • [34] Graph Computing System and Application Based on Large-Scale Information Network
    Xu, Jingbo
    Li, Zhao
    Zeng, Weibin
    Huang, Jiaming
    SPACE INFORMATION NETWORK, SINC 2020, 2021, 1353 : 158 - 178
  • [35] Balance Model and Application of Construction and Operation Financing for Large-scale Comprehensive Transportation Hub
    Xu, Jing
    Zhu, Yuqiang
    2010 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (MSE 2010), VOL 3, 2010, : 456 - 459
  • [36] Application of multi-colony ant optimization in optimal commitment of automatic generation control units in large-scale hydropower station
    Wang, Yongqiang
    Zhou, Jianzhong
    Xiao, Wen
    Wang, Zhenzhen
    Zhang, Yongchuan
    Dianwang Jishu/Power System Technology, 2011, 35 (09): : 66 - 70
  • [37] CNN-based Model for Chinese Information Processing and its Application in Large-scale Book Purchasing
    Guo, Chi
    Yu, Peilin
    Guo, Wenfei
    Wang, Xiaxian
    2020 IEEE 44TH ANNUAL COMPUTERS, SOFTWARE, AND APPLICATIONS CONFERENCE (COMPSAC 2020), 2020, : 973 - 978
  • [38] Optimization of construction ventilation scheme for large-scale underground cavern group of Xiangjiaba hydropower station based on numerical simulation
    Li, Yan-Ling
    Yin, Qiang
    Mo, Zheng-Yu
    Tang, Cong-Zheng
    Chen, Xin
    Yang, Xing-Guo
    Sichuan Daxue Xuebao (Gongcheng Kexue Ban)/Journal of Sichuan University (Engineering Science Edition), 2010, 42 (04): : 1 - 6
  • [39] The Second Development Based on FLAC3D and Its Application in Seismic Response Analysis of Large-scale Underground Caverns in Yingxiuwan Hydropower Station
    Zuo, ShuangYing
    Xiao, Ming
    PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION (ICMS2009), VOL 6, 2009, : 529 - 534
  • [40] Production system optimal operation model based on large-scale system theory
    Wang, Zhiguo
    MANUFACTURING PROCESSES AND SYSTEMS, PTS 1-2, 2011, 148-149 : 47 - 52