共 50 条
- [41] STUDY ON THE REASONABLE RSR OF ARCH AND ITS INFLUENCING FACTORS IN METRO USING THE PBA METHOD CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2023, 32 (02): : 229 - 239
- [44] Study of surface settlement and flexible joint pipeline deformation induced by metro station construction with PBA method Wang, T. (wangting9578@163.com), 1600, Editorial Office of China Civil Engineering Journal (45):
- [46] The investigation of Cut-and-cover, top-down construction method for a metro underground station; case study: 'Naghsh-e-Jahan Metro Station, Esfahan, Iran' JOURNAL OF MATERIALS AND ENGINEERING STRUCTURES, 2021, 8 (04): : 491 - 504
- [48] Optimization Study on Key Technology of Improved Arch Cover Method Construction for Underground Metro Stations Based on Similar Model Test APPLIED SCIENCES-BASEL, 2024, 14 (10):
- [50] Study on Lateral Dynamic Response of Pile Foundation in Liquefiable Soil by Using FBG Method INNOVATION IN CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE, 2012, 238 : 337 - +