Numerical study study on the response of ground movements to construction activities of a metro station using the pile-beam-arch method

被引:33
|
作者
Li, B. [1 ,3 ]
Wang, Z. Z. [2 ]
机构
[1] Wuhan Univ Technol, Sch Transportat, Wuhan, Hubei, Peoples R China
[2] Dalian Univ Technol, Sch Civil Engn, Dalian, Peoples R China
[3] Hubei Highway Engn Res Ctr, Wuhan, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
Metro station; The pile-beam-arch method; Pilot tunnels; Ground surface settlement; Settlement control measures; SUBWAY STATION; EXCAVATION; SETTLEMENT;
D O I
10.1016/j.tust.2019.03.014
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper aims to investigate the issues associated with the pile-beam-arch method for construction of metro stations. First, a detailed description of the procedures involved in the construction of a metro station is given. Secondly, a three-dimensional numerical model is established by FLAC(3D) to simulate the main construction process in practice, which consists of three phases, the excavation of the pilot tunnels, the installation of the load-bearing system, and the removal of the soil inside the metro station. These phases are then divided into fifteen construction steps, at the end of which the resulting ground surface settlements are recorded and analyzed. Numerical results reveal that the resulting displacements can be divided into four categories, the tunneling-induced settlement, the settlement occurs in response to an increase in vertical pressure, the tunneling-induced settlement in the presence of the load-bearing system, and the settlement occurs in response to a decrease in vertical pressure. Thirdly, the effects of settlement control measures are evaluated and discussed. Lastly, the comparison between the simulated and observed ground surface settlements collected from the existing literature are used to illustrate the effects of dewatering and the construction of working shafts and connecting tunnels.
引用
收藏
页码:209 / 220
页数:12
相关论文
共 50 条
  • [41] STUDY ON THE REASONABLE RSR OF ARCH AND ITS INFLUENCING FACTORS IN METRO USING THE PBA METHOD
    Sun, Jing
    CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2023, 32 (02): : 229 - 239
  • [42] Evaluation of ground settlement in response to shield penetration using numerical and statistical methods: a metro tunnel construction case
    Wang, Fan
    Gou, Biancai
    Zhang, Qiling
    Qin, Yawei
    Li, Bo
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2016, 12 (09) : 1024 - 1037
  • [43] Construction of subway station using the small pipe roof-beam method: A case study of Shifu Road station in Shenyang
    Bai, Qian
    Zhang, Yingda
    Zhao, Wen
    Jia, Pengjiao
    Li, Shengang
    Wang, Zhiguo
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 135
  • [44] Study of surface settlement and flexible joint pipeline deformation induced by metro station construction with PBA method
    Wang, T. (wangting9578@163.com), 1600, Editorial Office of China Civil Engineering Journal (45):
  • [45] Study on the effect of a new construction method for a large span metro underground station in Tabriz-Iran
    Sadaghiani, Mohammad H.
    Dadizadeh, Saleh
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2010, 25 (01) : 63 - 69
  • [46] The investigation of Cut-and-cover, top-down construction method for a metro underground station; case study: 'Naghsh-e-Jahan Metro Station, Esfahan, Iran'
    Cambyse, Behniya
    Amir, Tavallaie Nejad
    Hossein, Salari Rad
    JOURNAL OF MATERIALS AND ENGINEERING STRUCTURES, 2021, 8 (04): : 491 - 504
  • [47] Study on thaw settlement grouting applied to connected aisle construction with artificial ground freezing method in metro tunnel
    Yue Feng-tian
    Zhang Shui-bin
    Li Wen-yong
    Huang Hai-bin
    ROCK AND SOIL MECHANICS, 2008, 29 (08) : 2283 - 2286
  • [48] Optimization Study on Key Technology of Improved Arch Cover Method Construction for Underground Metro Stations Based on Similar Model Test
    Yang, Wangxing
    Xu, Mingkai
    Peng, Wenxiang
    Liu, Taoying
    APPLIED SCIENCES-BASEL, 2024, 14 (10):
  • [49] Subway station construction using combined shield and shallow tunnelling method: Case study of Gaojiayuan station in Beijing
    Cao, Liqiang
    Fang, Qian
    Zhang, Dingli
    Chen, Tielin
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 82 : 627 - 635
  • [50] Study on Lateral Dynamic Response of Pile Foundation in Liquefiable Soil by Using FBG Method
    Li, Yurun
    Liang, Yan
    Wei, Xing
    Wang, Yunlong
    Cao, Zhenzhong
    INNOVATION IN CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE, 2012, 238 : 337 - +