Multiperiod Mean Conditional Value at Risk Asset Allocation: Is It Advantageous to Be Time Consistent?

被引:14
|
作者
Forsyth, Peter A. [1 ]
机构
[1] Univ Waterloo, Sch Comp Sci, Waterloo, ON N2L 3G1, Canada
来源
SIAM JOURNAL ON FINANCIAL MATHEMATICS | 2020年 / 11卷 / 02期
基金
加拿大自然科学与工程研究理事会;
关键词
multi-period mean CVAR; time consistent; precommitment; asset allocation; VARIANCE PORTFOLIO OPTIMIZATION; VALUE-AT-RISK; JUMP-DIFFUSION; STOCHASTIC-CONTROL; STRATEGIES; SELECTION;
D O I
10.1137/19M124650X
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
We formulate the multiperiod, time consistent mean-CVAR (conditional value at risk) asset allocation problem in a form amenable to numerical computation. Our numerical algorithm can impose realistic constraints such as no shorting, no leverage, and discrete rebalancing. We focus on long term (i.e., 30 year) strategies, which would be typical of an investor in a defined contribution pension plan. A comparison with precommitment mean-CVAR strategies shows that adding the time consistent constraint compares unfavorably with the pure precommitment strategy. Since the precommitment strategy computed at time zero is identical to a time consistent strategy based on an alternative objective function, the time zero precommitment mean-CVAR strategy is implementable in this case. Hence it would seem that there is little to be gained from enforcing time consistency.
引用
收藏
页码:358 / 384
页数:27
相关论文
共 50 条
  • [31] A conditional value at risk based stochastic allocation of SOP in distribution networks
    Ebrahimi, Hasan
    Galvani, Sadjad
    Talavat, Vahid
    Farhadi-Kangarlu, Mohammad
    ELECTRIC POWER SYSTEMS RESEARCH, 2024, 228
  • [32] A Conditional Value-at-Risk Based Inexact Water Allocation Model
    Shao, L. G.
    Qin, X. S.
    Xu, Y.
    WATER RESOURCES MANAGEMENT, 2011, 25 (09) : 2125 - 2145
  • [33] ESTIMATION OF CONDITIONAL VALUE-AT-RISK FOR INPUT UNCERTAINTY WITH BUDGET ALLOCATION
    Zhu, Helin
    Zhou, Enlu
    2015 WINTER SIMULATION CONFERENCE (WSC), 2015, : 655 - 666
  • [34] Time-consistent Shapley value allocation of pollution cost reduction
    Petrosjan, L
    Zaccour, G
    JOURNAL OF ECONOMIC DYNAMICS & CONTROL, 2003, 27 (03): : 381 - 398
  • [35] Asset allocation via the conditional first exit time or how to avoid outliving your money
    Milevsky M.A.
    Ho K.
    Robinson C.
    Review of Quantitative Finance and Accounting, 1997, 9 (1) : 53 - 70
  • [36] Dynamic Average Value-at-Risk Allocation on Worst Scenarios in Asset Management
    Yoshida, Yuji
    Kumamoto, Satoru
    THEORY AND APPLICATIONS OF MODELS OF COMPUTATION, TAMC 2019, 2019, 11436 : 674 - 683
  • [37] Time-consistent mean-variance asset-liability management with random coefficients
    Wei, Jiaqin
    Wang, Tianxiao
    INSURANCE MATHEMATICS & ECONOMICS, 2017, 77 : 84 - 96
  • [38] INTERNATIONAL ASSET ALLOCATION WITH TIME-VARYING RISK - AN ANALYSIS AND IMPLEMENTATION
    CUMBY, R
    FIGLEWSKI, S
    HASBROUCK, J
    JAPAN AND THE WORLD ECONOMY, 1994, 6 (01) : 1 - 25
  • [39] Testing Conditional Asset Pricing in Pakistan: The Role of Value-at-risk and Illiquidity Factors
    Azher, Sara
    Iqbal, Javed
    JOURNAL OF EMERGING MARKET FINANCE, 2018, 17 : S259 - S281
  • [40] INTERNATIONAL ASSET ALLOCATION WITH TIME-VARYING RISK - AN ANALYSIS AND IMPLEMENTATION
    CUMBY, R
    FIGLEWSKI, S
    HASBROUCK, J
    JOURNAL OF FINANCE, 1993, 48 (03): : 1079 - 1080