Hydro-Quebec's defence plan against extreme contingencies

被引:40
|
作者
Trudel, G [1 ]
Bernard, S [1 ]
Scott, G [1 ]
机构
[1] Hydro Quebec, Montreal, PQ, Canada
关键词
Defence plan; Extreme contingency; Generation rejection; Load shedding; Remedial action scheme; Special protection system;
D O I
10.1109/59.780908
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In recent years, Hydro-Quebec has undertaken a major program to upgrade the reliability of its transmission system. Much effort has focused on increasing the system's ability to withstand extreme contingencies, usually caused by multiple incidents or the successive tripping of transmission lines. In order to counteract such events on its system, Hydro-Quebec has adopted a number of special defensive measures, globally called "defence plan against extreme contingencies". The goal of this plan, which will be fully operational by 1998, is to detect and confine incidents that exceed the system's strength. Entirely automatic, it will rely mainly on: a generation rejection and/or remote load shedding system (RPTC) a 735 kV shunt reactor automatic switching system; an undervoltage load shedding system; an underfrequency load shedding system. This paper summarizes Hydro-Quebec's current orientation for safeguarding its system after extreme contingencies and describes the various automatic measures adopted and, in particular, the RPTC system, one of the main components of the defence plan. The RPTC system will detect multiple line losses directly from fifteen 735-kV substations, include four generation rejection sites and a centralized remote load shedding system.
引用
收藏
页码:958 / 965
页数:8
相关论文
共 50 条
  • [21] Designing a reliable power system: Hydro-Quebec's integrated approach
    Trudel, G
    Gingras, JP
    Pierre, JR
    PROCEEDINGS OF THE IEEE, 2005, 93 (05) : 907 - 917
  • [22] OPERATIONAL EXPERIENCE WITH STATE ESTIMATION AT HYDRO-QUEBEC
    Lefebvre, S.
    Prevost, J.
    Rizzi, J. C.
    Ye, P.
    2008 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-11, 2008, : 2934 - 2941
  • [23] Experiences and Challenges in Contingency Analysis at Hydro-Quebec
    Huang, J. A.
    Loud, L.
    Vanier, G.
    Lambert, B.
    Guillon, S.
    2012 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2012,
  • [24] THE HYDRO-QUEBEC LINE OF CONDUCT REGARDING REMUNERATION
    CHARTIER, R
    RELATIONS INDUSTRIELLES-INDUSTRIAL RELATIONS, 1964, 19 (02): : 263 - 266
  • [25] EVAA, Hydro-Quebec organize EV symposium
    不详
    POWER ENGINEERING, 1997, 101 (06) : 18 - 18
  • [26] LOAD CHARACTERISTICS AND THE STABILITY OF THE HYDRO-QUEBEC SYSTEM
    NGUYEN, CT
    PANNETON, JG
    ROBICHAUD, Y
    STJACQUES, A
    SRINIVASAN, K
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1980, 99 (01): : 7 - 7
  • [27] Hydro-Quebec's challenges and experiences in on-line DSA applications
    Loud, L.
    Guillon, S.
    Vanier, G.
    Huang, J. A.
    Riverin, L.
    Lefebvre, D.
    Rizzi, J-C.
    IEEE POWER AND ENERGY SOCIETY GENERAL MEETING 2010, 2010,
  • [28] Planning levels and harmonic measurements on hydro-Quebec's transmission system
    Beaulieu, G
    8TH INTERNATIONAL CONFERENCE ON HARMONICS AND QUALITY OF POWER, PROCEEDINGS, VOLS 1 AND 2, 1998, : 445 - 448
  • [29] The RECRE system:: Restoration planning for hydro-Quebec's power system
    Naggar, Raouf
    Cauchon, Luc
    Henault, Stephane
    Phan, Si Truc
    2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 2815 - +
  • [30] THE PLUME MODEL MODIS - INTEGRATION IN THE HYDRO-QUEBEC SHELL
    KRUEGER, O
    EPPEL, DP
    LEVESQUE, S
    LEFEBVRE, G
    INTERNATIONAL JOURNAL OF ENVIRONMENT AND POLLUTION, 1995, 5 (4-6) : 664 - 670