Schedule robustness in the periodic supply vessels planning problem with stochastic demand and travel time

被引:4
|
作者
Cruz, Roberto [1 ]
Mendes, Andre Bergsten [1 ]
Bahiense, Laura [2 ]
机构
[1] Univ Sao Paulo, Dept Naval Architecture & Ocean Engn, Ave Prof Luciano Gualberto 1380, BR-05508010 Sao Paulo, Brazil
[2] Univ Fed Rio de Janeiro, Alberto Luiz Coimbra Inst, Grad Sch & Res Engn, Syst Engn & Comp Sci Program, Rua Moniz Aragao 360, BR-21941594 Rio De Janeiro, Brazil
关键词
schedule reliability; stochastic demand and travel time; periodic supply vessel planning; optimization under uncertainty; periodic routing problem under uncertainty; offshore supply vessel operations; VEHICLE-ROUTING PROBLEM; FLEET COMPOSITION; SPEED OPTIMIZATION; SERVICE; WINDOWS; PRICE; OIL;
D O I
10.1111/itor.13241
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The periodic supply vessel planning problem (PSVPP) consists in determining a periodic schedule and the respective fleet composition for servicing offshore units on a regular basis. One of the challenges for the PSVPP is determining reliable schedules with a good compromise between reliability and cost. This work extends the PSVPP by including stochastic demand and travel time. We also introduce a novel methodology based on a voyage-based model to deal with the schedule robustness. Basically, key statistical parameters related to the routes' demand and execution time are generated. They are used together with a set of probability combinations to incorporate the schedule reliability into the optimization model. Therefore, schedule reliability is an input parameter in the optimization model. The instances used in the study are based on real data from Brazil. A comparison of the new methodology to conventional approaches is presented, and a Monte Carlo simulation is used to evaluate the quality of the solutions. The proposed methodology is able to generate robust schedules at a lower cost compared to the conventional approaches. The proposed methodology might be applied to other stochastic problems, where schedule reliability is a key parameter for the problem.
引用
收藏
页码:2338 / 2365
页数:28
相关论文
共 50 条
  • [21] Integrated scheduling and material supply planning under nonstationary stochastic demand and random supply yield
    Lu H.
    Wang H.
    Li F.
    Liu D.
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2019, 39 (03): : 647 - 658
  • [22] A shortest path problem in a stochastic network with exponential travel time
    Peer, S. K.
    Sharma, Dinesh K.
    Chakraborty, B.
    Jana, R. K.
    INTERNATIONAL JOURNAL OF APPLIED MANAGEMENT SCIENCE, 2021, 13 (03) : 179 - 199
  • [23] ON A VEHICLE ROUTING PROBLEM WITH TIME WINDOWS AND STOCHASTIC TRAVEL TIMES
    Chen, Jack J.
    Wong, Jacky C. F.
    Leung, Janny M. Y.
    Cheng, C. H.
    TRANSPORTATION AND THE ECONOMY, 2005, : 550 - 550
  • [24] The vehicle routing problem with hard time windows and stochastic travel and service time
    Miranda, Douglas Moura
    Conceicao, Samuel Vieira
    EXPERT SYSTEMS WITH APPLICATIONS, 2016, 64 : 104 - 116
  • [25] Stochastic production planning for a biofuel supply chain under demand and price uncertainties
    Awudu, Iddrisu
    Zhang, Jun
    APPLIED ENERGY, 2013, 103 : 189 - 196
  • [26] Learning Automata Based Method for Solving Demand and Supply Problem with Periodic Behaviors
    Lu, Haoye
    Srinivasan, Anand
    Nayak, Amiya
    2017 IEEE INTERNATIONAL CONFERENCE ON BIG DATA (BIG DATA), 2017, : 3254 - 3260
  • [27] Robust vehicle routing problem with deadlines and travel time/demand uncertainty
    Lee, C.
    Lee, K.
    Park, S.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2012, 63 (09) : 1294 - 1306
  • [28] Traffic Demand Estimation Using Observed Path Travel Time in a Stochastic Network
    Sun C.
    Song M.-C.
    Chen Z.-C.
    Chang Y.-L.
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2021, 34 (03): : 206 - 215
  • [29] Supply planning for a closed loop supply chain with uncertain demand and price-dependent stochastic return
    Shi, Jianmai
    Zhang, Guoqing
    Lai, Kin Keung
    2009 INTERNATIONAL CONFERENCE ON BUSINESS INTELLIGENCE AND FINANCIAL ENGINEERING, PROCEEDINGS, 2009, : 616 - 620
  • [30] Vehicle routing and scheduling problem with time windows and stochastic demand
    Chang, MS
    Lin, YC
    Hsueh, CF
    TRANSPORTATION NETWORK MODELING 2004, 2004, (1882): : 79 - 87