Three-Stage Assembly Flow Shop Scheduling Problem with a Fixed Maintenance Period

被引:2
|
作者
Yuan, Yuan [1 ]
Han, Xin [2 ]
Zhou, Yong [2 ]
Liu, Xingwu [3 ]
机构
[1] Dalian Minzu Univ, Sch Informat & Commun Engn, Dalian 116600, Peoples R China
[2] Dalian Univ Technol, Sch Software Technol, Dalian 116620, Peoples R China
[3] Dalian Univ Technol, Sch Math Sci, Dalian 116620, Peoples R China
关键词
Scheduling; assembly flow shop; maintenance period; approximation algorithm; 2-MACHINE FLOWSHOP; MACHINE; 3-MACHINE; MAKESPAN; APPROXIMATION; HEURISTICS; ALGORITHM;
D O I
10.1142/S0217595923400195
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper investigates the three-stage assembly flow shop scheduling problem, provided that there is a fixed maintenance period (MP) imposed on one of the machines in the first stage, the objective is to minimize the makespan. The starting time and duration of MP are known in advance, during MP no job can be processed on the corresponding machine. Only the non-resumable scenario is considered, i.e., if a job fails to finish before MP, it must restart from the beginning after the machine becomes available again, rather than continuing its processing. The problem generalizes the three-stage assembly flow shop scheduling problem without MPs and is therefore strongly NP-hard. To the best of our knowledge, the problem has not been explored so far. We propose three approximation algorithms for the problem.
引用
收藏
页数:17
相关论文
共 50 条
  • [41] Two-stage flow-shop scheduling problem with non-identical second stage assembly machines
    Navaei, J.
    Ghomi, S. M. T. Fatemi
    Jolai, F.
    Shiraqai, M. E.
    Hidaji, H.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 69 (9-12): : 2215 - 2226
  • [42] Two-stage flow-shop scheduling problem with non-identical second stage assembly machines
    J. Navaei
    S. M. T. Fatemi Ghomi
    F. Jolai
    M. E. Shiraqai
    H. Hidaji
    The International Journal of Advanced Manufacturing Technology, 2013, 69 : 2215 - 2226
  • [43] Open Shop Scheduling Problem with a Non-resumable Flexible Maintenance Period
    Yuan, Yuan
    Han, Xin
    Liu, Xinbo
    Lan, Yan
    COMBINATORIAL OPTIMIZATION AND APPLICATIONS, COCOA 2021, 2021, 13135 : 512 - 526
  • [44] Dataset of metaheuristics for the flow shop scheduling problem with maintenance activities integrated
    Branda, Antonella
    Castellano, Davide
    Guizzi, Guido
    Popolo, Valentina
    DATA IN BRIEF, 2021, 36
  • [45] Adaptive hybrid estimation of distribution algorithm for solving a certain kind of three-stage assembly flowshop scheduling problem
    Li, Zihui
    Qian, Bin
    Hu, Rong
    Zhang, Changsheng
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (07): : 1829 - 1845
  • [46] NSGA-II with Iterated Greedy for a Bi-objective Three-stage Assembly Flowshop Scheduling Problem
    Campos, Saulo Cunha
    Claudio Arroyo, Jose Elias
    GECCO'14: PROCEEDINGS OF THE 2014 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 2014, : 429 - 436
  • [47] Rule-based hybrid EDA for three-stage assembly integrated scheduling problem with job batches transportation
    Deng C.
    Qian B.
    Hu R.
    Wang L.
    Sun Z.-X.
    Kongzhi yu Juece/Control and Decision, 2020, 35 (10): : 2507 - 2513
  • [48] A two-stage flow shop scheduling problem with transportation considerations
    Chikhi, Nacira
    Abbas, Moncef
    Benmansour, Rachid
    Bekrar, Abdelghani
    Hanafi, Said
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2015, 13 (04): : 381 - 402
  • [49] BATCH SCHEDULING IN A TWO-STAGE FLEXIBLE FLOW SHOP PROBLEM
    Gerstl, Enrique
    Mosheiov, Gur
    Sarig, Assaf
    FOUNDATIONS OF COMPUTING AND DECISION SCIENCES, 2014, 39 (01) : 3 - 16
  • [50] A two-stage flow shop scheduling problem with transportation considerations
    Nacira Chikhi
    Moncef Abbas
    Rachid Benmansour
    Abdelghani Bekrar
    Saïd Hanafi
    4OR, 2015, 13 : 381 - 402