Methods for local big data integration to reduce geotechnical uncertainty and risk on subsurface infrastructure projects

被引:0
|
作者
Mooney, M. A. [1 ]
Grasmick, J. G. [2 ]
Gangrade, R. [3 ]
机构
[1] Colorado Sch Mines, Ctr Underground, Golden, CO USA
[2] Emprise Concepts LLC, Evergreen, CO USA
[3] Arup, San Francisco, CA USA
关键词
D O I
10.1201/9781003348030-337
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Sensing and information technologies, adopted now routinely on underground urban infrastructure projects, have enabled the production of massive streams of spatial-temporal data. Yet, geotechnical risk remains uncomfortably high and more often than not drives the schedule, cost and overall risk of such projects. In short, geotechnical risk is not decreasing in proportion to the uptake in big data. The reasons for this include a lack of methods to translate the increased spatial-temporal data into a commensurate reduction in geotechnical risk. This paper presents research-driven methods to reduce geotechnical risk using the increased data now available. A typical urban TBM project environment is presented and data from multiple actual tunnel projects is used to demonstrate method efficacy. The paper first addresses the quantification of baseline spatial geotechnical parameters and their uncertainty, and the consequential risks that exist during tunnel construction, e.g., ground and building deformation, stuck TBM, clogging, groundwater inflow, etc. Because these risks are quantified based on apriori site investigation data, optimization of geotechnical site investigation to best decrease risk uncertainty is addressed and demonstrated. Geotechnical monitoring data and TBM data collected during tunnel construction is used with back-analysis techniques to improve estimation, including decreasing uncertainty, of geotechnical parameters. This is demonstrated using 3D computational modeling of ground deformation and machine learning/empirical model-based estimation of clogging and TBM cutterhead wear risk. The paper also presents the reduction in geotechnical risk uncertainty by implementing a machine-learning approach to characterize the ground through which the TBM advances. A Bayesian approach to updating estimate magnitude and uncertainty of tunneling-induced ground deformation is presented by using the monitoring data and back-analysis.
引用
收藏
页码:2799 / 2806
页数:8
相关论文
共 50 条
  • [21] CRITICAL UNCERTAINTY FACTORS FOR EFFICIENT RISK ALLOCATION IN PRIVATELY FINANCED PUBLIC INFRASTRUCTURE PROJECTS IN AUSTRALIA
    Jin, Xiao-Hua
    Zuo, Jian
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2011, 11 (03) : 19 - 34
  • [22] Homo Heuristicus: From Risk Management to Managing Uncertainty in Large-Scale Infrastructure Projects
    Love, Peter E. D.
    Ika, Lavagnon A.
    Pinto, Jeffrey K.
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2024, 71 : 1940 - 1949
  • [23] Assessing the performance of the ensemble Kalman filter for subsurface flow data integration under variogram uncertainty
    Jafarpour, B.
    Tarrahi, Mohammadali
    WATER RESOURCES RESEARCH, 2011, 47
  • [24] Big data analysis model for predicting operational risk in overseas construction projects
    Yun, Jiyeong
    Jeong, Kyeongtae
    Youn, Jongyoung
    Lee, Donghoon
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2022, 21 (06) : 2524 - 2531
  • [25] Big Data Integration in Remote Sensing across a Distributed Metadata-Based Spatial Infrastructure
    Fan, Junqing
    Yan, Jining
    Ma, Yan
    Wang, Lizhe
    REMOTE SENSING, 2018, 10 (01)
  • [26] Developing Business Risk Resilience through Risk Management Infrastructure: The Moderating Role of Big Data Analytics
    Singh, Nitya
    INFORMATION SYSTEMS MANAGEMENT, 2022, 39 (01) : 34 - 52
  • [27] Identifying Geotechnical Risk and Assigning Ownership on Water and Wastewater Pipeline Projects Using Alternative Project Delivery Methods
    Francom, Tober
    Markham, Chris
    PIPELINES 2017: PLANNING AND DESIGN, 2017, : 494 - 503
  • [28] Plan integration and plan quality: combining assessment tools to align local infrastructure priorities to reduce hazard vulnerability
    Masterson, Jaimie
    Katare, Anjali
    Thapa, Jeewasmi
    Malecha, Matthew
    Yu, Siyu
    Berke, Philip
    SUSTAINABLE AND RESILIENT INFRASTRUCTURE, 2023, 8 (04) : 359 - 374
  • [29] Spatio-temporal methods to reduce data uncertainty in restricted movement on a road network
    Meratnia, N
    Kainz, W
    de By, R
    ADVANCES IN SPATIAL DATA HANDLING, 2002, : 391 - 402
  • [30] Research of Food Safety Risk Assessment Methods based on Big Data
    Ma, Yongjun
    Hou, Yangyang
    Liu, Yushan
    Xue, Yonghao
    PROCEEDINGS OF 2016 IEEE INTERNATIONAL CONFERENCE ON BIG DATA ANALYSIS (ICBDA), 2016, : 142 - 146