Experimental Study on Seismic Performance of External Socket Precast Bridge Pier-Footing Connections for Rapid Postearthquake Replacement

被引:4
|
作者
Chen, Liang [1 ]
Zhang, Yingao [1 ]
Zuo, Rui [1 ]
Yang, Dahai [2 ]
Xiang, Nailiang [1 ]
机构
[1] Hefei Univ Technol, Coll Civil Engn, Hefei 230009, Peoples R China
[2] Anhui Transport Consulting & Design Inst Co Ltd, Hefei, Anhui, Peoples R China
基金
中国国家自然科学基金;
关键词
Accelerated bridge construction (ABC); External socket pier-footing connection; Postearthquake rapid replacement; Seismic performance; Experimental study;
D O I
10.1061/JBENF2.BEENG-6262
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Assembly of precast elements is a widely adopted technology for achieving accelerated bridge construction (ABC) owing to the increased construction speed and quality. Connection methods between precast structural members, if designed properly, can facilitate a convenient postearthquake replacement of damaged members and hence enable rapid function recovery of bridges. This study proposes a new precast bridge pier-footing connection using external sockets. The external sockets are prefabricated on the top of bridge footings and the precast piers can be directly inserted into the sockets with postgrouting. Quasi-static cyclic loading tests were conducted on four 1/4-scale pier-footing specimens, including three external socket pier specimens and a cast-in-place (CIP) specimen for comparison purposes. The experimental results show that the external sockets with normal design sizes are effective precast pier-footing connection methods, ensuring that plastic hinges are formed in the piers without damaging the external sockets and footings. Because of the shortened effective pier height, the socket piers show increased lateral stiffness and strength but decreased displacement capacity compared with the CIP pier. The measured peak horizontal forces for the precast socket pier specimens PCS-1, PCS-2, and PCS-3 are increased by 7.5%, 34.5%, and 51.4%, respectively. However, the ultimate displacements are reduced by 11.1%-22.0% compared with the CIP pier. The hysteretic energy dissipation of the socket piers is compared with that of the CIP pier, with a difference less than 20%. Postexperiment replacement of a tested precast pier was carried out, which demonstrates the feasibility of rapidly replacing damaged bridge piers when using the proposed external socket connections. A subsequent experiment reveals that the newly replaced pier specimen could show an equivalent seismic performance to the previous specimen. The maximum differences of the peak force and initial stiffness between the two piers are within 6.7%, and the difference of the dissipated energy is only 3.8%. The experimental results verified the effectiveness of the rapid replacement.
引用
收藏
页数:11
相关论文
共 39 条
  • [21] Seismic performance of short precast columns with UHPC grouted sleeve connections: An experimental and numerical study
    Lei, Song
    Liu, Laijun
    Wu, Fangwen
    Lin, Weiwei
    Peng, Kai
    Cao, Jincheng
    STRUCTURES, 2023, 55 : 427 - 440
  • [22] Experimental and Numerical Study on the Seismic Performances of Reinforcement-Embedded RC Column-to-Precast Cap Beams with Socket Connections
    Peng, Wenqiang
    Lu, Wenliang
    Liu, Sitian
    Liu, Yong
    Xu, Linfeng
    Li, Fenglin
    BUILDINGS, 2023, 13 (09)
  • [23] Experimental study on seismic performance of precast-prestressed beam-to-column concrete connections
    Li, Zhen-Bao
    Dong, Ting-Feng
    Ma, Hua
    Feng, Li-Feng
    Bai, Cong-Min
    Advances in Structural Engineering:Theory and Applications Vols 1 and 2, 2006, : 1650 - 1657
  • [24] Seismic Performance of Embedded Connections for Precast Hybrid Coupled Wall Systems: Experimental Study and Theoretical Analysis
    Lu, Hailu
    Su, Mingzhou
    Wang, Yadong
    Zhou, Yubo
    Shen, Shihao
    BUILDINGS, 2024, 14 (08)
  • [25] Experimental study on seismic performance of precast welded wire mesh ceramsite concrete shear wall with connections
    Zhang, Huadong
    Yuan, Kang
    Zhang, Gang
    Gao, Yueyue
    EARTHQUAKES AND STRUCTURES, 2024, 27 (06) : 485 - 497
  • [26] Post-fire seismic performance of precast concrete columns with grouted sleeve connections: An experimental study
    Li, Junhua
    Wang, Weichen
    Chen, Pingjun
    Chen, Jiawei
    Ma, Jiaxing
    STRUCTURES, 2024, 66
  • [27] Experimental study on the seismic performance of high speed railway bridge pier under low cyclic loading
    Zhao, Guanyuan, 1600, Chinese Academy of Railway Sciences (35):
  • [28] Experimental study on seismic performance of novel precast concrete beam-column joints using mechanical connections
    Sun, Chuanzhi
    Zhuang, Mei-Ling
    Bai, Liutao
    Gao, Li
    Yu, Changrong
    Yang, Jun
    Zhu, Hanbo
    Qiao, Yan
    Shao, Yuefeng
    Zhang, Weihua
    BULLETIN OF EARTHQUAKE ENGINEERING, 2023, 21 (09) : 4429 - 4448
  • [29] Experimental study on seismic performance of novel precast concrete beam-column joints using mechanical connections
    Chuanzhi Sun
    Mei-Ling Zhuang
    Liutao Bai
    Li Gao
    Changrong Yu
    Jun Yang
    Hanbo Zhu
    Yan Qiao
    Yuefeng Shao
    Weihua Zhang
    Bulletin of Earthquake Engineering, 2023, 21 : 4429 - 4448
  • [30] Numerical Study on Seismic Performance of Buckling-Restrained Braced Double-Pier RC Bridge with Bolted Gusset Connections
    Lu, Junkai
    Ji, Pengfei
    Cheng, Peifeng
    Xu, Guoshan
    APPLIED SCIENCES-BASEL, 2023, 13 (07):