Experimental Study on Seismic Performance of External Socket Precast Bridge Pier-Footing Connections for Rapid Postearthquake Replacement

被引:4
|
作者
Chen, Liang [1 ]
Zhang, Yingao [1 ]
Zuo, Rui [1 ]
Yang, Dahai [2 ]
Xiang, Nailiang [1 ]
机构
[1] Hefei Univ Technol, Coll Civil Engn, Hefei 230009, Peoples R China
[2] Anhui Transport Consulting & Design Inst Co Ltd, Hefei, Anhui, Peoples R China
基金
中国国家自然科学基金;
关键词
Accelerated bridge construction (ABC); External socket pier-footing connection; Postearthquake rapid replacement; Seismic performance; Experimental study;
D O I
10.1061/JBENF2.BEENG-6262
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Assembly of precast elements is a widely adopted technology for achieving accelerated bridge construction (ABC) owing to the increased construction speed and quality. Connection methods between precast structural members, if designed properly, can facilitate a convenient postearthquake replacement of damaged members and hence enable rapid function recovery of bridges. This study proposes a new precast bridge pier-footing connection using external sockets. The external sockets are prefabricated on the top of bridge footings and the precast piers can be directly inserted into the sockets with postgrouting. Quasi-static cyclic loading tests were conducted on four 1/4-scale pier-footing specimens, including three external socket pier specimens and a cast-in-place (CIP) specimen for comparison purposes. The experimental results show that the external sockets with normal design sizes are effective precast pier-footing connection methods, ensuring that plastic hinges are formed in the piers without damaging the external sockets and footings. Because of the shortened effective pier height, the socket piers show increased lateral stiffness and strength but decreased displacement capacity compared with the CIP pier. The measured peak horizontal forces for the precast socket pier specimens PCS-1, PCS-2, and PCS-3 are increased by 7.5%, 34.5%, and 51.4%, respectively. However, the ultimate displacements are reduced by 11.1%-22.0% compared with the CIP pier. The hysteretic energy dissipation of the socket piers is compared with that of the CIP pier, with a difference less than 20%. Postexperiment replacement of a tested precast pier was carried out, which demonstrates the feasibility of rapidly replacing damaged bridge piers when using the proposed external socket connections. A subsequent experiment reveals that the newly replaced pier specimen could show an equivalent seismic performance to the previous specimen. The maximum differences of the peak force and initial stiffness between the two piers are within 6.7%, and the difference of the dissipated energy is only 3.8%. The experimental results verified the effectiveness of the rapid replacement.
引用
收藏
页数:11
相关论文
共 39 条
  • [1] Experimental investigation of seismic behavior of precast pier-footing socket connection with different design parameters
    Yang, Jun
    Guo, Tong
    Zeng, Cihang
    Shi, Huiduo
    Fu, Chenxi
    STRUCTURAL CONCRETE, 2024, 25 (03) : 1938 - 1952
  • [2] Hysteretic behavior of precast bridge pier with different pier-footing connections using UHPC grout
    Fan, Jiuhong
    Zhou, Xuhong
    Zuo, Zhiwu
    Jiang, Ruijuan
    Di, Jin
    Xiao, Bowen
    STRUCTURES, 2025, 73
  • [3] Multi-factor analysis and optimization on seismic behavior of precast pier-footing socket connection considering different connection parameters
    Yang, Jun
    Zhang, Xiaohua
    Guo, Tong
    Zeng, Cihang
    Xia, Zhiyuan
    Gu, Sheng
    STRUCTURES, 2024, 66
  • [4] Experimental study on seismic performance of precast bridge pier with grouted splice sleeve
    College of Civil Engineering, Tongji University, Shanghai
    200092, China
    Tongji Daxue Xuebao, 7 (1010-1016):
  • [5] Experimental study on direct-shear behaviour of narrow joints in socket connections for precast pier-to-pile footing systems
    Chen, Mingzhu
    De Corte, Wouter
    Jiang, Haibo
    Taerwe, Luc
    STRUCTURES, 2024, 61
  • [6] Experimental studies on the seismic performance of socket bridge pier with connection reinforcement
    Peng, Wenqiang
    Lu, Wenliang
    Liu, Sitian
    Liu, Yong
    Xu, Linfeng
    Li, Fenglin
    STRUCTURES, 2025, 71
  • [7] Seismic performance of precast double-column pier with UHPC-filled socket connections
    Si, Xiaolong
    Wen, Jianian
    Zhang, Guangda
    Jia, Zhenlei
    Han, Qiang
    ENGINEERING STRUCTURES, 2023, 285
  • [8] Experimental study on seismic performance of a new precast segmental assembled single column bridge pier
    Xiong, Ergang
    Xie, Yupeng
    Wang, Wenxiang
    Mei, Zhongxing
    Cao, Tao
    Taciroglu, Ertugrul
    STRUCTURES, 2024, 68
  • [9] Seismic Performance of Precast Bridge Columns with Socket and Pocket Connections Based on Quasi-Static Cyclic Tests: Experimental and Numerical Study
    Wang, Zhiqiang
    Li, Tiantian
    Qu, Hongya
    Wei, Hongyi
    Li, Yongbo
    JOURNAL OF BRIDGE ENGINEERING, 2019, 24 (11)
  • [10] Experimental Study on Seismic Performance of Precast Piers with Socket Connection
    Li H.
    Liu D.
    Wang Y.
    Xiong H.
    Zhang J.
    Bridge Construction, 2024, 54 (01) : 95 - 102