Stochastic Project Scheduling Optimization for Multi-stage Prefabricated Building Construction with Reliability Application

被引:2
|
作者
Wang, Jingjing [1 ,2 ]
Liu, Huimin [1 ]
Wang, Zongxi [1 ]
机构
[1] Qingdao Univ Technol, Sch Management Engn, Qingdao 266525, Peoples R China
[2] Qingdao Univ Technol, Ctr Struct Acoust & Machine Fault Diag, Qingdao 266525, Peoples R China
基金
中国国家自然科学基金;
关键词
Stochastic project scheduling; Multi-stage prefabricated building construction; Duration reliability; DEPSO; DIFFERENTIAL EVOLUTION; ACTIVITY DURATIONS; SERIAL METHOD; RESOURCE; MODEL; MAKESPAN;
D O I
10.1007/s12205-023-2164-8
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study investigates a project scheduling problem of prefabricated building (PB) construction in an uncertain environment. Different from the traditional scheduling models in PB construction, we consider a complex multi-stage cooperation system including the production, transportation and assembly (PTA) phases. In this system, both activity durations and resource amounts are stochastic variables. By applying the reliability theory to the stochastic scheduling model innovatively, we formulate a duration reliability model to maximize the probability of non-delayed project completion, within the resource constraints. As the proposed model is a non-deterministic polynomial hard (NP-hard) problem, a hybrid meta-heuristic differential evolution particle swarm optimization (DEPSO) algorithm is developed, which is utilized the mutation factor of the differential evolution (DE) algorithm in the framework of the particle swarm optimization (PSO). Finally, a real-life example of a PB construction project is used to explore the performance of the proposed DEPSO algorithm. The result shows that the hybrid algorithm DEPSO can better find the global optimal solution in the multi-dimensional optimization problem.
引用
收藏
页码:2356 / 2371
页数:16
相关论文
共 50 条
  • [21] Multi-stage stochastic districting: optimization models and solution algorithms
    Pomes, Anika
    Diglio, Antonio
    Nickel, Stefan
    Saldanha-da-Gama, Francisco
    ANNALS OF OPERATIONS RESEARCH, 2025, : 2225 - 2251
  • [22] OPTIMIZATION SIMULATION: THE CASE OF MULTI-STAGE STOCHASTIC DECISION MODELS
    Sen, Suvrajeet
    Zhou, Zhihong
    PROCEEDINGS OF THE 2011 WINTER SIMULATION CONFERENCE (WSC), 2011, : 4098 - 4109
  • [23] Process scheduling for prefabricated construction based on multi-objective optimization algorithm
    Li, Yan
    Wu, Jiajun
    Hao, Yi
    Gao, Yuchen
    Chai, Runqi
    Chai, Senchun
    Zhang, Baihai
    AUTOMATION IN CONSTRUCTION, 2024, 168
  • [24] Low-carbon Distributed Scheduling Optimization for Multi-park Stochastic Situations Based on a Multi-stage Dual Game
    Yue, Ziyi
    Liu, Huazhi
    Li, Yonggang
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2024, 44 (22): : 8860 - 8873
  • [25] Multi-Stage Adjustable Robust Optimization for Process Scheduling Under Uncertainty
    Lappas, Nikolaos H.
    Gounaris, Chrysanthos E.
    AICHE JOURNAL, 2016, 62 (05) : 1646 - 1667
  • [26] Multi-stage optimization framework of satellite scheduling for large areas of interest
    Chatterjee, Abhijit
    Tharmarasa, Ratnasingham
    ADVANCES IN SPACE RESEARCH, 2024, 73 (03) : 2024 - 2039
  • [27] Appointment scheduling for multi-stage sequential service systems with stochastic service durations
    Zhou, Shenghai
    Yue, Qing
    COMPUTERS & OPERATIONS RESEARCH, 2019, 112
  • [28] A Multi-stage Stochastic Scheduling Method for Microgrid with Multiple Types of Energy Storage
    Li, Haozhe
    Zhou, Yuzhou
    Mai, Qiaozhu
    Zhao, Jiexing
    Chen, Mengxiao
    Cao, Xiaoyu
    Hu, Jianchen
    Yang, Lun
    Liu, Kun
    2024 14TH ASIAN CONTROL CONFERENCE, ASCC 2024, 2024, : 2539 - 2545
  • [29] Scheduling Stochastic Multi-stage Jobs on Elastic Computing Services in Hybrid Clouds
    Zhu, Jie
    Li, Xiaoping
    Ruiz, Ruben
    Xu, Xiaolong
    Zhang, Yi
    2016 IEEE INTERNATIONAL CONFERENCE ON WEB SERVICES (ICWS), 2016, : 678 - 681
  • [30] Resource constrained project scheduling formulation for optimization of product input sequence and workforce scheduling for multi-stage multi-product cellular production lines
    Nishi, Tatsushi
    Kurakado, Hidefumi
    Liu, Ziang
    JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2024, 18 (05):