Frequency-constrained unit commitment for power systems with high renewable energy penetration

被引:16
|
作者
Zhang, Yuqian [1 ]
Guo, Qinglai [1 ]
Zhou, Yanzhen [1 ]
Sun, Hongbin [1 ]
机构
[1] Tsinghua Univ, Dept Elect Engn, Beijing 100084, Peoples R China
关键词
Frequency constraint; Frequency response; Power system; Unit commitment; Renewable energy; GENERATION; STABILITY; STORAGE; GRIDS;
D O I
10.1016/j.ijepes.2023.109274
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Modern power systems are confronted with great challenges of frequency instability due to the conventional generators constantly being replaced by renewable energy source. Therefore, it is necessary to consider the frequency stability constraints in unit commitment processes to obtain safer operation plans. In this paper, an analytical approach for the frequency stability constraint is proposed. This approach is given by estimating the largest disturbance the system can withstand. Then, a novel frequency constrained unit commitment model is proposed by incorporating the proposed approach into a unit commitment model. The diverse governor response characteristics are considered in the proposed frequency constrained unit commitment model, and the essential inertia and reserve level are accurately estimated. The proposed model is formulated as a mixed-integer nonlinear programming problem, and generalized Benders decomposition is adopted to facilitate the solution generation. The convergence of the decomposition-based solution is proved. Case studies on the New England 39bus system and a regional system are carried out where the performance of the proposed model is compared with two existing frequency constrained unit commitment models. The results show that the proposed model can guarantee frequency security while preserving the economic factors in power systems with high renewable energy penetration.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] Ramp Enhanced Unit Commitment for Energy Scheduling with High Penetration of Renewable Generation
    Yong, T.
    Yao, J.
    Yang, S.
    Yang, Z.
    2015 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, 2015,
  • [22] Voltage Stability Constrained Unit Commitment in Power Systems With High Penetration of Inverter-Based Generators
    Chu, Zhongda
    Teng, Fei
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2023, 38 (02) : 1572 - 1582
  • [23] Storage management by rolling stochastic unit commitment for high renewable energy penetration
    Bakirtzis, Emmanouil A.
    Simoglou, Christos K.
    Biskas, Pandelis N.
    Bakirtzis, Anastasios G.
    ELECTRIC POWER SYSTEMS RESEARCH, 2018, 158 : 240 - 249
  • [24] Data-driven continuous-time framework for frequency-constrained unit commitment
    Rajabdorri, Mohammad
    Lobato, Enrique
    Sigrist, Lukas
    Aghaei, Jamshid
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2024, 162
  • [25] Frequency-constrained unit commitment problem with considering dynamic ramp rate limits in the presence of wind power generation
    Safari, Amin
    Shahsavari, Hossein
    NEURAL COMPUTING & APPLICATIONS, 2019, 31 (09): : 5241 - 5254
  • [26] Frequency-constrained unit commitment problem with considering dynamic ramp rate limits in the presence of wind power generation
    Amin Safari
    Hossein Shahsavari
    Neural Computing and Applications, 2019, 31 : 5241 - 5254
  • [27] Modeling Frequency Dynamics in Unit Commitment With a High Share of Renewable Energy
    Zhang, Ziyang
    Du, Ershun
    Teng, Fei
    Zhang, Ning
    Kang, Chongqing
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2020, 35 (06) : 4383 - 4395
  • [28] Integrating renewable energy and plug-in electric vehicles into security constrained unit commitment for hybrid power systems
    Dhawale, Pravin G.
    Kamboj, Vikram Kumar
    Bath, S. K.
    Raboaca, Maria Simona
    Filote, Constantin
    ENERGY REPORTS, 2024, 11 : 2035 - 2048
  • [29] Application of Battery Energy Storage Systems for Primary Frequency Control in Power Systems with High Renewable Energy Penetration
    Amin, Md Ruhul
    Negnevitsky, Michael
    Franklin, Evan
    Alam, Kazi Saiful
    Naderi, Seyed Behzad
    ENERGIES, 2021, 14 (05)
  • [30] Frequency-Constrained Stochastic Planning Towards a High Renewable Target Considering Frequency Response Support From Wind Power
    Li, Hao
    Qiao, Ying
    Lu, Zongxiang
    Zhang, Baosen
    Teng, Fei
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2021, 36 (05) : 4632 - 4644