An Optimization Model to Address the Skilled Labor Shortage in the Construction Industry

被引:2
|
作者
Adekunle, Olawale [1 ]
Jha, Manoj K. [2 ]
机构
[1] Coakley Williams Construct, 535 Potomac Rd, Joppa, MD 21085 USA
[2] Univ Maryland, Dept Informat Technol, Global Campus, Adelphi, MD 20783 USA
关键词
Skilled labor shortage; Construction industry; Linear programming; Mathematical optimization; Trend analysis;
D O I
10.1007/s40999-024-00941-w
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
An optimization problem is formulated in this study to optimize the total investment in education, apprenticeship, and financial incentive to address the skilled labor shortages in the construction industry. Three separate mathematical models, namely linear programming (LP) models, fuzzy mathematical models, and structural equation models are compared for their accuracy, robustness, and ease of application in solving the optimization problem. LP models are found to be the best fit for solving the optimization problem. Relevant data on construction budget and investment preferences in education, apprenticeship, and financial incentive are obtained through a survey questionnaire from construction firms engaged in commercial and residential construction. The survey response suggests that more apprentices lean toward electrical and plumbing over carpentry due to the higher pay scale in both trade fields, thus reducing the skilled labor shortage in both areas when compared to carpentry. The optimization results indicate that apprenticeship and financial incentives play a significant role in reducing short-term labor shortages. Education, on the other hand, plays a significant role in reducing the labor shortage in the long run. A sensitivity analysis shows different optimal investments for the optimal allocation of labor shortages to be overcome by investments in education, apprenticeship, and financial incentives. A more robust analysis using additional data can be performed in future works to further investigate the relative effectiveness of investments in education, apprenticeship, and financial incentives in reducing skilled labor shortage.
引用
收藏
页码:981 / 993
页数:13
相关论文
共 50 条
  • [41] LAW OF LABOR RELATIONS IN THE CONSTRUCTION INDUSTRY
    MORIN, F
    INDUSTRIAL RELATIONS, 1969, 24 (02): : 422 - 431
  • [42] Technology and labor relations in the construction industry
    Thieblot, AJ
    JOURNAL OF LABOR RESEARCH, 2002, 23 (04) : 559 - 573
  • [43] Technology and labor relations in the construction industry
    A. J. Thieblot
    Journal of Labor Research, 2002, 23 : 559 - 573
  • [44] Labor relation in construction industry in India
    Ansari, Sk Arshad
    Karthik, D.
    MATERIALS TODAY-PROCEEDINGS, 2022, 60 : 1581 - 1587
  • [45] CONSTRUCTION LABOR RELATIONS IN MINING INDUSTRY
    GIBSON, WJ
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1972, 65 (724): : 58 - &
  • [46] Using Fuzzy Approach to Model Skill Shortage in Vietnam's Labor Market in the Context of Industry 4.0
    My Tien Ha Duong
    Diep Van Nguyen
    Phong Thanh Nguyen
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2020, 10 (03) : 5864 - 5868
  • [47] Research on the Training Pattern of Skilled Worker in the Chinese Construction Industry
    Sun Jie
    Huang Jinfang
    He Baizhou
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 120 - +
  • [48] The Involvement of Local Skilled Labour in Malaysia's Construction Industry
    Mohd Fateh, Mohd Ashraf
    Mohamed, Mohamed Rizal
    Omar, Siti Aisyah
    FRONTIERS IN BUILT ENVIRONMENT, 2022, 8
  • [49] A Critical Analysis of Skilled Labor Supply and Demand in the Australian Hospitality Industry
    Beesley, Lisa G.
    Davidson, Michael
    JOURNAL OF QUALITY ASSURANCE IN HOSPITALITY & TOURISM, 2013, 14 (03) : 264 - 280
  • [50] System Dynamics Modeling for Investigating the Retention of Skilled Labor in the Construction Market
    Elbashbishy, Tamima
    El-Adaway, Islam H.
    COMPUTING IN CIVIL ENGINEERING 2023-RESILIENCE, SAFETY, AND SUSTAINABILITY, 2024, : 564 - 572