Modified Streamlined Optimization Algorithm for Time-Cost Tradeoff Problems of Complex Large-Scale Construction Projects

被引:4
|
作者
Wang, Jia [1 ]
Han, Congji [1 ]
Li, Xinghua [1 ]
机构
[1] Hunan Univ, Coll Civil Engn, Changsha, Hunan, Peoples R China
基金
中国博士后科学基金;
关键词
Time-cost tradeoff (TCT); Optimization; Integer programming; Critical path identification method; Network analysis; GENETIC ALGORITHMS; OFF PROBLEM; COMPRESSION;
D O I
10.1061/JCEMD4.COENG-12970
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Although research on time-cost tradeoff (TCT) problems has been extensively conducted, there are still few applications of TCT optimization methods in the scheduling of projects with practical size and complexity. As a good attempt, a streamlined optimization algorithm has recently been developed for solving TCT problems with a continuous curvilinear activity time-cost relationship. However, the algorithm encounters the difficulties of high memory requirements and computational demand when it is implemented in complex large-scale projects whose networks may involve tens of millions of paths and hundreds of activities. To overcome such difficulties, this study presents a modified version of the streamlined optimization algorithm. Particularly, a new method for identifying critical paths is proposed in the modified algorithm. Also, a modeling problem has been addressed in order to consolidate the theoretical foundation of the algorithm. As illustrated by the experimental examples, the modified streamlined algorithm outperforms the original algorithm and the commonly used genetic algorithm in terms of optimality, robustness, and computational efficiency. This study thus contributes to the development of commercial scheduling software capable of tackling practical TCT problems.
引用
收藏
页数:12
相关论文
共 50 条
  • [31] Multiproject Time-cost Trade-off Scheduling Problem for Large-scale Construction Systems under Fuzzy Uncertainty
    Ouyang Yong-liu
    Zhang Meng-xiang
    Han Lu
    Lu Yi
    2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING - 22ND ANNUAL CONFERENCE PROCEEDINGS, VOLS I AND II, 2015, : 282 - 292
  • [32] Multi-objective tradeoff optimization under uncertainty in large-scale construction project
    Xu, Wuming
    PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2011, : 186 - 189
  • [33] HANDLING NONLINEAR LARGE-SCALE PROBLEMS WITH MODIFIED FIREFLY ALGORITHM
    Bahmanifirouzi, Bahman
    Fard, Abdollah Kavousi
    Niknam, Taher
    UNCERTAINTY MODELING IN KNOWLEDGE ENGINEERING AND DECISION MAKING, 2012, 7 : 394 - 399
  • [34] A modified Polak-Ribiere-Polyak conjugate gradient algorithm for large-scale optimization problems
    Yuan, Gonglin
    Wei, Zengxin
    Zhao, Qiumei
    IIE TRANSACTIONS, 2014, 46 (04) : 397 - 413
  • [35] Errors in large-scale plant construction. How companies can avoid cost risks in large-scale projects
    Burghardt
    Stahl und Eisen, 2023, 143 (10): : 56 - 57
  • [36] An Evolutionary Algorithm for Large-Scale Sparse Multiobjective Optimization Problems
    Tian, Ye
    Zhang, Xingyi
    Wang, Chao
    Jin, Yaochu
    IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2020, 24 (02) : 380 - 393
  • [37] Improved wolf pack algorithm for large-scale optimization problems
    Chen X.
    Meng F.
    Wu J.
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2021, 41 (03): : 790 - 808
  • [38] Hybridized Krill Herd Algorithm for Large-Scale Optimization Problems
    Strumberger, Ivana
    Bacanin, Nebojsa
    Tuba, Milan
    2017 IEEE 15TH INTERNATIONAL SYMPOSIUM ON APPLIED MACHINE INTELLIGENCE AND INFORMATICS (SAMI), 2017, : 473 - 478
  • [39] Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling
    Liu, Dian
    Li, Heng
    Wang, Hongwei
    Qi, Chao
    Rose, Timothy
    EXPERT SYSTEMS WITH APPLICATIONS, 2020, 148
  • [40] Construction time-cost trade-off analysis using ant colony optimization algorithm
    Kuang Ya-ping
    Xiong Ying
    PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 2039 - 2044