Single machine scheduling problems involving job-dependent step-deterioration dates and job rejection

被引:5
|
作者
Mor, Baruch [1 ]
机构
[1] Ariel Univ, Dept Econ & Business Adm, IL-40700 Ariel, Israel
基金
以色列科学基金会;
关键词
Single machine scheduling; Variable job processing times; Step deterioration; Job-dependent deterioration dates; Job rejection; MINIMIZING MAKESPAN; PROCESSING TIMES; FLOW-SHOP;
D O I
10.1007/s12351-023-00754-0
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This research focuses on scheduling problems with step-deteriorating job processing times. This phenomenon reflects various real-life settings where the processing time of the jobs, processed after their pre-determined and job-dependent deterioration date, is defined by a step function. A single machine setting is assumed, and optional job rejection is considered. The scheduling measure focused on in this study is makespan, and three variants of the basic problem are considered: (i) minimizing the sum of the scheduling measure and total rejection cost; (ii) minimizing the scheduling criterion, given an upper bound on the total rejection cost; and (iii) minimizing the total rejection cost, subject to a constraint on the scheduling measure. As minimizing the makespan on a single machine with step deterioration is known to be ordinary NP-hard, even if all jobs share a common deterioration date, all presented problems are NP-hard. For all problems, pseudo-polynomial time dynamic-programming (DP) algorithms are presented, establishing that they remain ordinary NP-hard. Furthermore, an extensive experimental study was conducted to determine the efficiency of the proposed algorithms.
引用
收藏
页数:19
相关论文
共 50 条