A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness

被引:6
|
作者
Prata, Bruno de Athayde [1 ]
Nagano, Marcelo Seido [2 ]
机构
[1] Univ Fed Ceara, Dept Ind Engn, Fortaleza, Brazil
[2] Univ Sao Paulo, Dept Prod Engn, Sao Carlos, Brazil
关键词
Production scheduling; weighted quadratic tardiness; no-wait flowshop; iterated greedy algorithm; NEIGHBORHOOD SEARCH; SQUARED TARDINESS; SETUP TIMES; MAKESPAN; MACHINE; SUM; METAHEURISTICS; HEURISTICS; SHOPS;
D O I
10.1080/0305215X.2022.2144274
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article addresses the no-wait permutation flowshop layout where the jobs must be processed continuously in the available machines without interruption. The objective function is weighted quadratic tardiness minimization. Since the problem under study is NP-hard, an iterated greedy algorithm is introduced where the parameters are selected according to a variable neighbourhood descent framework. In the authors' innovative algorithm, in the first iteration of the search process, the parameters are initialized with a fixed number. In the remaining iterations, such parameters are reduced deterministically, aiming to explore distinct values throughout the search process. The proposal is compared with five other algorithms proposed for closely related problems, considering two performance measures: the Relative Deviation Index (RDI) and the Success Rate (SR). The proposed algorithm produced average values of RDI and SR of 1.2% and 86.9%, respectively. The computational results demonstrated that the authors' proposal outperformed all the other five algorithms under comparison.
引用
收藏
页码:2070 / 2083
页数:14
相关论文
共 50 条
  • [21] An energy-efficient bi-objective no-wait permutation flowshop scheduling problem to minimize total tardiness and total energy consumption
    Yuksel, Damla
    Tasgetiren, M. Fatih
    Kandiller, Levent
    Gao, Liang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 145
  • [22] An effective iterated local search algorithm for the distributed no-wait flowshop scheduling problem
    Avci, Mustafa
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2023, 120
  • [23] A cooperative iterated greedy algorithm for the serial distributed permutation flowshop scheduling problem
    Han, Biao
    Pan, Quan-Ke
    Gao, Liang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (12) : 4245 - 4272
  • [24] An effective Iterated Greedy algorithm for the distributed permutation flowshop scheduling with due windows
    Jing, Xue-Lei
    Pan, Quan-Ke
    Gao, Liang
    Wang, Yu-Long
    APPLIED SOFT COMPUTING, 2020, 96
  • [25] An improved iterated greedy algorithm for the distributed assembly permutation flowshop scheduling problem
    Huang, Ying-Ying
    Pan, Quan-Ke
    Huang, Jiang-Ping
    Suganthan, P. N.
    Gao, Liang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 152
  • [26] Iterative local search algorithm for no-wait flowshop scheduling problems to minimize makespan
    Wang, Chuyang
    Li, Xiaoping
    Wang, Qian
    PROCEEDINGS OF THE 2008 12TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, VOLS I AND II, 2008, : 908 - +
  • [27] An Iterated Greedy Algorithm for Distributed Flowshop Group Scheduling Problem with Total Tardiness Criterion
    Wang, Zhi-Yuan
    Yu, Cheng-Min
    Pan, Quan-Ke
    Li, Yuan-Zhen
    2021 PROCEEDINGS OF THE 40TH CHINESE CONTROL CONFERENCE (CCC), 2021, : 2009 - 2014
  • [28] Minimizing Total Tardiness in the Distributed Flowshop Group Scheduling Problem with an Iterated Greedy Algorithm
    Wang, Zhi-Yuan
    Pan, Yiran
    Pan, Quan-Ke
    2022 34TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2022, : 5024 - 5029
  • [29] An Iterated Greedy Algorithm for Distributed Hybrid Flowshop Scheduling Problem with Total Tardiness Minimization
    Wang, Jing-jing
    Wang, Ling
    2019 IEEE 15TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2019, : 350 - 355
  • [30] Permutation flowshop scheduling to minimize the total tardiness with learning effects
    Lee, Wen-Chiung
    Chung, Yu-Hsiang
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 141 (01) : 327 - 334