共 50 条
A new receiver clock model to enhance BDS-3 real-time PPP time transfer with the PPP-B2b service
被引:15
|作者:
Ge, Yulong
[1
,7
]
Wang, Qing
[2
]
Wang, Yong
[3
,8
]
Lyu, Daqian
[4
]
Cao, Xinyun
[5
]
Shen, Fei
[5
]
Meng, Xiaolin
[6
]
机构:
[1] Nanjing Normal Univ, Sch Marine Sci & Engn, Nanjing 210023, Peoples R China
[2] Southeast Univ, Sch Instrument Sci & Engn, Nanjing 211189, Peoples R China
[3] Jiangsu Prov Inst Surveying & Mapping Engn, Nanjing 210013, Peoples R China
[4] Natl Univ Def Technol, Coll Elect Engn, Hefei 230037, Peoples R China
[5] Nanjing Normal Univ, Sch Geog, Nanjing 210023, Peoples R China
[6] Beijing Univ Technol, Fac Architecture Civil & Transportat Engn, Beijing 100124, Peoples R China
[7] Chinese Acad Sci, Innovat Acad Precis Measurement Sci & Technol, State Key Lab Geodesy & Earths Dynam, Wuhan 430077, Peoples R China
[8] Wuhan Univ, GNSS Res Ctr, Wuhan 430079, Peoples R China
来源:
SATELLITE NAVIGATION
|
2023年
/
4卷
/
01期
基金:
中国国家自然科学基金;
关键词:
PPP-B2b;
BDS-3;
Time transfer;
Receiver clock model;
GPS;
D O I:
10.1186/s43020-023-00097-3
中图分类号:
V [航空、航天];
学科分类号:
08 ;
0825 ;
摘要:
A new Precise Point Positioning (PPP) service, called the PPP-B2b service, has been implemented in the BeiDou-3 Navigation Satellite System (BDS-3), which brings new opportunities for time transfer. However, the solution using the traditional PPP method with the PPP-B2b correction still absorbs some unknown errors and needs reconverging when there exist abnormal data. We developed a new receiver clock model to improve PPP time transfer using the PPP-B2b correction. The traditional PPP time transfers using PPP-B2b with BDS-3, Global Positioning System (GPS), and BDS-3/GPS (Scheme1) are compared with the corresponding time transfer with the proposed clock model (Scheme2). The results show that GPS-only PPP is not recommended because of low accuracy of 2 ns. BDS-3 or BDS-3/GPS PPP time transfers in Scheme1 can realize about 0.2 ns accuracy. When the new clock model is applied, the accuracy can be improved by up to 45% and 39.8% for BDS-3 and BDS-3/GPS PPP, respectively. The proposed clock model can significantly improve the short-term frequency stability by 57.4%, but less for the long-term stability.
引用
收藏
页数:12
相关论文