The Significance of Time Constraints in Unit Commitment Problems

被引:0
|
作者
Bukhsh, Waqquas [1 ]
机构
[1] Univ Strathclyde, Dept Elect & Elect Engn, Glasgow G1 1XW, Scotland
关键词
Generators; Renewable energy sources; Mathematical models; Costs; Biological system modeling; Electricity supply industry; Power markets; Linear programming; Optimization methods; Market research; Power system planning; Investment; Incentive schemes; Electricity markets; integer programming; optimization; unit commitment problem; merit order dispatch; linear programming; MERIT ORDER; OPTIMIZATION;
D O I
10.1109/ACCESS.2024.3369484
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Electricity market clearing models are crucial for operational and investment planning in modern power systems. Two commonly used models for market clearing are the merit-order and unit commitment models. While the merit-order employs a snapshot approach and lacks precision in representing time-based variations in demand and generation, the unit commitment model incorporates crucial temporal constraints. This paper highlights the significance of temporal constraints in market clearing models, emphasizing the potential for significant errors in generation commitment if these constraints are not carefully considered. Using real data from the Irish electricity system, the impact of temporal constraints on intra-day market clearing is demonstrated, comparing with the merit-order rule with the unit commitment solution. The findings reveal 6% underestimation in market clearing prices when compared to unit commitment solutions. The minimum stable operating constraints of thermal units were identified as having the most substantial impact on the unit commitment solution. This study underscores the risk of significant errors in generation planning if temporal constraints are not adequately factored in, advocating for a more accurate approach for market clearing models.
引用
收藏
页码:31515 / 31522
页数:8
相关论文
共 50 条
  • [21] New Mixed-Integer Nonlinear Programming Formulations for the Unit Commitment Problems with Ramping Constraints
    Bacci, Tiziano
    Frangioni, Antonio
    Gentile, Claudio
    Tavlaridis-Gyparakis, Kostas
    OPERATIONS RESEARCH, 2024, 72 (05) : 2153 - 2167
  • [22] Optimal Unit Commitment Using Equivalent Linear Minimum Up and Down Time Constraints
    Zendehdel, Nadia
    Karimpour, Ali
    Oloomi, Majid
    2008 IEEE 2ND INTERNATIONAL POWER AND ENERGY CONFERENCE: PECON, VOLS 1-3, 2008, : 1021 - +
  • [23] PROBLEMS ASSOCIATED WITH UNIT COMMITMENT IN UNCERTAINTY
    SCHULTE, RP
    LE, KD
    VIERRA, RH
    NAGEL, GD
    JENKINS, RT
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1985, 104 (08): : 2072 - 2078
  • [24] Unit commitment problems using GA
    Zhu, YY
    Wang, F
    Bai, XM
    POWERCON 2002: INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY, VOLS 1-4, PROCEEDINGS, 2002, : 625 - 631
  • [25] A Stochastic Optimization Formulation of Unit Commitment With Reliability Constraints
    Xiong, Peng
    Jirutitijaroen, Panida
    IEEE TRANSACTIONS ON SMART GRID, 2013, 4 (04) : 2200 - 2208
  • [26] Sequential Relaxation of Unit Commitment with AC Transmission Constraints
    Zohrizadeh, Fariba
    Kheirandishfard, Mohsen
    Nasir, Adnan
    Madani, Ramtin
    2018 IEEE CONFERENCE ON DECISION AND CONTROL (CDC), 2018, : 2408 - 2413
  • [27] Stochastic Unit Commitment Problem with Security and Emissions Constraints
    Laia, Rui
    Pousinho, Hugo M. I.
    Melicio, Rui
    Mendes, Victor M. F.
    Collares-Pereira, Manuel
    TECHNOLOGICAL INNOVATION FOR COLLECTIVE AWARENESS SYSTEMS, 2014, 423 : 388 - 397
  • [28] Unit Commitment Considering Generation Flexibility and Environmental Constraints
    Lu, Shuai
    Makarov, Yuri V.
    Zhu, Yunhua
    Lu, Ning
    Kumar, Nirupama Prakash
    Chakrabarti, Bhujanga B.
    IEEE POWER AND ENERGY SOCIETY GENERAL MEETING 2010, 2010,
  • [29] Subhourly unit commitment with feasible energy delivery constraints
    Yang, Yuanchao
    Wang, Jianhui
    Guan, Xiaohong
    Zhai, Qiaozhu
    APPLIED ENERGY, 2012, 96 : 245 - 252
  • [30] Effects of Security Constraints on Unit Commitment with Wind Generators
    Choling, D.
    Yu, P.
    Venkatesh, B.
    2009 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-8, 2009, : 878 - +