Optimization of Preventive Maintenance Timing of Highway Bridges Considering China's "Dual Carbon" Target

被引:0
|
作者
Pei, Lunyou [1 ]
Wang, Bing [2 ]
Liu, Ying [1 ]
Liu, Xiaoling [1 ]
机构
[1] Ningbo Univ, Fac Maritime & Transportat, Ningbo 315211, Peoples R China
[2] Ningbo Univ, Sch Civil & Environm Engn & Geog Sci, Ningbo 315211, Peoples R China
基金
中国国家自然科学基金;
关键词
highway bridge; preventive maintenance; strategy optimization; dual carbon goals; technical condition degradation; carbon price; LIFE-CYCLE; ENERGY; MARKET;
D O I
10.3390/su152316388
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The dual carbon target is a two-stage carbon reduction goal proposed by China, while the bridge maintenance strategy does not consider the need for sustainable development. Therefore, this article studies the optimization of bridge maintenance timing under China's dual carbon goals. Firstly, this paper aims to minimize the total cost of maintenance and carbon emissions, considering the continuous effects of carbon pricing and emissions in the context of the dual carbon goals. The CHINAGEM-E model is employed to predict carbon prices, and a preventive maintenance decision-making method for highway bridges is established. Secondly, based on the theory of material residual strength, a degradation model for the technical condition of highway bridges is constructed. Finally, an in-depth case analysis of an in-service highway bridge is conducted to derive optimal maintenance solutions under three scenarios. In comparison to scenarios considering only maintenance costs or those based on benchmark carbon prices, the comprehensive maintenance cost under the dual carbon targets is the highest. In the total maintenance cost, carbon emission costs constitute over 50%, emphasizing the need for increased attention to carbon emission cost studies in future maintenance research. The methodology proposed in this paper is the first to connect carbon prices with the timing of preventive maintenance for bridges, providing a more scientific and sustainable basis for future highway bridge maintenance decisions.
引用
收藏
页数:15
相关论文
共 50 条
  • [21] Bi-objective Optimization for Scheduling on Identical Parallel Machine Considering Preventive Maintenance and Job's Release Time
    Shen, Chunchun
    Chen, Yarong
    Chou, Fuh-Der
    Huang, Peiyu
    2021 3RD INTERNATIONAL CONFERENCE ON MACHINE LEARNING, BIG DATA AND BUSINESS INTELLIGENCE (MLBDBI 2021), 2021, : 630 - 637
  • [22] Calculation and optimization of China's power distortion under carbon peaking target
    Li, Xing
    Liu, Zimin
    Wu, Honglei
    Yang, Dan
    ENERGY, 2024, 306
  • [23] The carbon reduction puzzle in stock market: Evidence from China's "Dual-Carbon Target"
    You, Mingyuan
    Liu, Peizhi
    APPLIED ECONOMICS LETTERS, 2024, 31 (19) : 2034 - 2041
  • [24] Demand and fluctuation range of China's coal production under the dual carbon target
    Shi-hua, Ren
    Xiao-miao, Jiao
    De-Zhi, Zheng
    Ya-ning, Zhang
    He-ping, Xie
    Zheng-quan, Guo
    ENERGY REPORTS, 2024, 11 : 3267 - 3282
  • [25] An electricity-carbon joint market optimization model for coal-fired power system under China's "dual-carbon" target
    Feng, Sida
    Zhang, Xingping
    JOURNAL OF CLEANER PRODUCTION, 2023, 423
  • [26] Probabilistic optimization of preventive maintenance inspection rates by considering correlations among maintenance costs, duration, and states transition probabilities
    Nasrfard, Farshid
    Mohammadi, Mohammad
    Rastegar, Mohammad
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 173
  • [27] Preventive maintenance optimization for repairable products considering two-dimensional warranty and customer satisfaction
    Wang, Yukun
    Liu, Yiliu
    Zhang, Aibo
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2019, 233 (04) : 553 - 566
  • [28] Joint optimization of two-dimensional basic warranty strategy and price considering preventive maintenance
    Li, Longhui
    Liu, Zixian
    Zhang, Zkaomin
    Dong, Fangqi
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (11): : 3812 - 3822
  • [29] Sustainability-based pre-earthquake probabilistic retrofit optimization of highway bridges considering risk attitudes
    Dong, Y.
    Frangopol, D. M.
    Sabatino, S.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 284 - 289
  • [30] Simulation study on carbon emission of China's electricity supply and demand under the dual-carbon target
    Wen, Lei
    Diao, Peixin
    JOURNAL OF CLEANER PRODUCTION, 2022, 379