Optimization of Preventive Maintenance Timing of Highway Bridges Considering China's "Dual Carbon" Target

被引:0
|
作者
Pei, Lunyou [1 ]
Wang, Bing [2 ]
Liu, Ying [1 ]
Liu, Xiaoling [1 ]
机构
[1] Ningbo Univ, Fac Maritime & Transportat, Ningbo 315211, Peoples R China
[2] Ningbo Univ, Sch Civil & Environm Engn & Geog Sci, Ningbo 315211, Peoples R China
基金
中国国家自然科学基金;
关键词
highway bridge; preventive maintenance; strategy optimization; dual carbon goals; technical condition degradation; carbon price; LIFE-CYCLE; ENERGY; MARKET;
D O I
10.3390/su152316388
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The dual carbon target is a two-stage carbon reduction goal proposed by China, while the bridge maintenance strategy does not consider the need for sustainable development. Therefore, this article studies the optimization of bridge maintenance timing under China's dual carbon goals. Firstly, this paper aims to minimize the total cost of maintenance and carbon emissions, considering the continuous effects of carbon pricing and emissions in the context of the dual carbon goals. The CHINAGEM-E model is employed to predict carbon prices, and a preventive maintenance decision-making method for highway bridges is established. Secondly, based on the theory of material residual strength, a degradation model for the technical condition of highway bridges is constructed. Finally, an in-depth case analysis of an in-service highway bridge is conducted to derive optimal maintenance solutions under three scenarios. In comparison to scenarios considering only maintenance costs or those based on benchmark carbon prices, the comprehensive maintenance cost under the dual carbon targets is the highest. In the total maintenance cost, carbon emission costs constitute over 50%, emphasizing the need for increased attention to carbon emission cost studies in future maintenance research. The methodology proposed in this paper is the first to connect carbon prices with the timing of preventive maintenance for bridges, providing a more scientific and sustainable basis for future highway bridge maintenance decisions.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] Benefit Evaluation of Preventive Maintenance of Highway Bridges Based on Fuzzy Neural Network
    Zou, Yiquan
    Fang, Jialin
    Liu, Zedong
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [2] Sustainability-informed maintenance optimization of highway bridges considering multi-attribute utility and risk attitude
    Sabatino, Samantha
    Frangopol, Dan M.
    Dong, You
    ENGINEERING STRUCTURES, 2015, 102 : 310 - 321
  • [3] Timing of Preventive Highway Maintenance: A Study from the Whole Life Cycle Perspective
    Wubuli, Abulimiti
    Li, Fangfang
    Cao, Shanwei
    Zhang, Lingling
    SUSTAINABILITY, 2025, 17 (03)
  • [4] Sustainable Highway Maintenance: Optimization of Existing Highway Vertical Alignment Considering Pavement Condition
    Mahanpoor, Mohammad
    Monajjem, Saeed
    Balali, Vahid
    SUSTAINABILITY, 2019, 11 (06)
  • [5] Optimization of equal-cycle maintenance strategy considering imperfect preventive maintenance
    Li, Xinlong
    Ran, Yan
    Zhang, Genbao
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART E-JOURNAL OF PROCESS MECHANICAL ENGINEERING, 2022, 236 (04) : 1392 - 1402
  • [6] Optimization of Renewable Warranty by Considering System Reliability and Preventive Maintenance and Repairs
    Chaimankong, Benjarut
    Chetthamrongchai, Paitoon
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2022, 21 (02): : 390 - 400
  • [7] Condition-Based Multiobjective Maintenance Decision Making for Highway Bridges Considering Risk Perceptions
    Gong, Changqing
    Frangopol, Dan M.
    JOURNAL OF STRUCTURAL ENGINEERING, 2020, 146 (05)
  • [8] A new preventive maintenance strategy optimization model considering lifecycle safety
    Shi, Yan
    Lu, Zhenzhou
    Huang, Hongzhong
    Liu, Yu
    Li, Yanfeng
    Zio, Enrico
    Zhou, Yicheng
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2022, 221
  • [9] Periodic maintenance optimization considering the difference of preventive maintenance effect based on generalized Polya process
    Li, Xinlong
    Ran, Yan
    Zhang, Genbao
    He, Yan
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART C-JOURNAL OF MECHANICAL ENGINEERING SCIENCE, 2022, 236 (16) : 9037 - 9046
  • [10] Investigation into Best Timing of Highway Asphalt Pavement Preventive Maintenance Based on Benefit-Cost Analysis
    Li, Hongmei
    Shang, Jianlin
    Shen, Zheng
    CICTP 2020: TRANSPORTATION EVOLUTION IMPACTING FUTURE MOBILITY, 2020, : 1896 - 1904