Practical Framework to Facilitate Constructability Implementation Using Building Information Modeling Approach: A Case Study

被引:1
|
作者
Samimpey, Rozita [1 ]
Saghatforoush, Ehsan [2 ]
机构
[1] Mehralborz Univ, Dept Project & Construct Management, Tehran, Iran
[2] Univ Witwatersrand, Sch Construct Econ & Management, Johannesburg, South Africa
关键词
Text constructability; construction projects; building information modeling (BIM); duplications; framework; BIM; DESIGN; MANAGEMENT; SYSTEM;
D O I
10.1142/S0219877024500044
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Constructability has always been the focus of many construction firms, to bring the construction knowledge and experience into the early project phases of planning and design. However, there have always been different ideas on how to perform it in the best way and to avoid lack of knowledge of project components and constructability concept, poor coordination among project team members, and wrong estimation of time and cost result in duplications and project wastes. Improper use of multidimensional modelings in the construction process, negatively affects the success of projects. The use of new technologies has enhanced the constructability implementation. This research provides a practical framework to apply the benefits of Building Information Modeling (BIM) to fulfill the prerequisites for constructability implementation. This framework reduces project wastes and prevents errors, delays, duplications, and thus reduces project time and cost. Using BIM, all project practitioners are present from the beginning of the project, and the needs of each member and project goals are identified. A powerful database is developed to access project data at any time, which can be effective in making critical decisions. In this way, it can facilitate constructability processes. According to the existing literature reviews and the results obtained from the interviews, this study has developed a practical framework that provides some solutions to effectively meet constructability prerequisites. This is important because many of the problems of construction infrastructure projects are due to insufficient communication, lack of integration, lack of familiarity with new technologies, duplications, and lack of attention to constructability of projects.
引用
收藏
页数:30
相关论文
共 50 条
  • [31] CHALLENGES AND SETBACKS IN THE IMPLEMENTATION OF BUILDING INFORMATION MODELLING (BIM): A CASE STUDY
    Al-Otaibi, Bassam
    BUILDING INFORMATION MODELLING (BIM) IN DESIGN, CONSTRUCTION AND OPERATIONS II, 2017, 169 : 15 - 23
  • [32] Building a Comprehensive Intent-Based Networking Framework: A Practical Approach from Design Concepts to Implementation
    Yu, Henry
    Rahimi, Hesam
    Janz, Christopher
    Wang, Dong
    Li, Zhen
    Yang, Chungang
    Zhao, Yehua
    JOURNAL OF NETWORK AND SYSTEMS MANAGEMENT, 2024, 32 (03)
  • [33] An Integrated Building Information Modeling and Life-Cycle Assessment Approach to Facilitate Design Decisions on Sustainable Building Projects in Canada
    Namaki, Parsa
    Vegesna, Bhavya Sree
    Bigdellou, Saeide
    Chen, Ruizhi
    Chen, Qian
    SUSTAINABILITY, 2024, 16 (11)
  • [34] Developing an Implementation Framework for Adaptive Learning: A Case Study Approach
    Mirata, Victoria
    Bergamin, Per
    PROCEEDINGS OF THE 18TH EUROPEAN CONFERENCE ON E-LEARNING (ECEL 2019), 2019, : 668 - 673
  • [35] The Implementation of Building Information Modeling Technology in University Teaching: The Case of the Polytechnic University of Madrid
    Lopez-Zaldivar, Oscar
    Verdu-Vazquez, Amparo
    Gil-Lopez, Tomas
    Lozano-Diez, Rafael V.
    INTERNATIONAL JOURNAL OF ENGINEERING EDUCATION, 2017, 33 (02) : 712 - 722
  • [36] Reducing Critical Hindrances to Building Information Modeling Implementation: The Case of the Singapore Construction Industry
    Liao, Longhui
    Teo, Evelyn Ai Lin
    Chang, Ruidong
    APPLIED SCIENCES-BASEL, 2019, 9 (18):
  • [37] Exploring the rate of adoption and implementation depth of building information modeling (BIM): A case of Kuwait
    Al-Roumi, Haya
    Al-Sabah, Ruqaya
    JOURNAL OF ENGINEERING RESEARCH, 2024, 12 (01): : 86 - 99
  • [38] Investigation of Coal Preparation for Life Cycle by Using Building Information Modeling (BIM): A Case Study
    Chen, Jian
    Guo, Da-Lin
    Dong, Xiao-Long
    Hou, Xiao-Bo
    Wang, Zhi-Feng
    GEOFLUIDS, 2022, 2022
  • [39] Investigation on the effectiveness of using building information modeling (BIM) tools in project management: a case study
    Datta, Shuvo Dip
    Sobuz, Md. Habibur Rahman
    Mim, Nusrat Jahan
    Nath, Amit Deb
    REVISTA DE LA CONSTRUCCION, 2023, 22 (02): : 306 - 320
  • [40] Implementation of Building Information Modeling to Improve Project Management
    Solahudin, Arijal Ahmad
    Khudri, Tubagus Muhamad Yusuf
    ICE-BEES 2021, 2022,