Another objection to the homogeneously weighted moving average control chart

被引:3
|
作者
Knoth, Sven [1 ,2 ]
机构
[1] Helmut Schmidt Univ, Hamburg, Germany
[2] Helmut Schmidt Univ Hamburg, Dept Math & Stat, Holstenhofweg 85, D-22043 Hamburg, Germany
关键词
average run-length; conditional detection delay; control chart; statistical process monitoring;
D O I
10.1002/qre.3242
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
It was recently demonstrated that homogeneously weighted moving average (HWMA) control charts are improper devices for an online detection of changes within a series of random variables. However, another attempt was made to bail out the concept underlying these charts. Here we want to re-emphasize that HWMA charts are dispensable by rebutting the arguments of the latter contribution.
引用
收藏
页码:353 / 362
页数:10
相关论文
共 50 条
  • [41] Progressive mean control chart is not a special case of an exponentially weighted moving average control chart
    Zafar, Raja Fawad
    Khoo, Michael B. C.
    Saha, Sajal
    Chong, Zhi Lin
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2021, 37 (06) : 2329 - 2333
  • [42] On designing new mixed modified exponentially weighted moving average- exponentially weighted moving average control chart
    Talordphop, Khanittha
    Sukparungsee, Saowanit
    Areepong, Yupaporn
    RESULTS IN ENGINEERING, 2023, 18
  • [43] Homogeneously Weighted Moving Average Control Charts: Overview, Controversies, and New Directions
    Malela-Majika, Jean-Claude
    Human, Schalk William
    Chatterjee, Kashinath
    MATHEMATICS, 2024, 12 (05)
  • [44] On Designing Distribution-Free Homogeneously Weighted Moving Average Control Charts
    Raza, Muhammad Ali
    Nawaz, Tahir
    Han, Dong
    JOURNAL OF TESTING AND EVALUATION, 2020, 48 (04) : 3154 - 3171
  • [45] Performance of Multivariate Homogeneously Weighted Moving Average Chart for Monitoring the Process Mean in the Presence of Measurement Errors
    Yousefi, Sahand
    Maleki, Mohammad Reza
    Salmasnia, Ali
    Anbohi, Maryam Kiani
    JOURNAL OF ADVANCED MANUFACTURING SYSTEMS, 2023, 22 (01) : 27 - 40
  • [46] New modified exponentially weighted moving average-moving average control chart for process monitoring
    Talordphop, Khanittha
    Sukparungsee, Saowanit
    Areepong, Yupaporn
    CONNECTION SCIENCE, 2022, 34 (01) : 1981 - 1998
  • [47] A generally weighted moving average control chart for monitoring the coefficient of variation
    Chen, Rui
    Li, Zhonghua
    Zhang, Jiujun
    APPLIED MATHEMATICAL MODELLING, 2019, 70 : 190 - 205
  • [48] An adaptive exponentially weighted moving average control chart for poisson processes
    Aly, Aya A.
    Saleh, Nesma A.
    Mahmoud, Mahmoud A.
    QUALITY ENGINEERING, 2021, 33 (04) : 627 - 640
  • [49] A sum of squares triple exponentially weighted moving average control chart
    Chatterjee, Kashinath
    Koukouvinos, Christos
    Lappa, Angeliki
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2021, 37 (06) : 2423 - 2457
  • [50] A Robust Exponentially Weighted Moving Average Control Chart for the Process Mean
    Khoo, Michael B. C.
    Sim, S. Y.
    JOURNAL OF MODERN APPLIED STATISTICAL METHODS, 2006, 5 (02) : 464 - 474