Two-Stage Stochastic Scheduling of Cascaded Hydropower-Wind-Photovoltaic Hybrid Systems Considering Contract Decomposition and Spot Market

被引:1
|
作者
Li, Yang [1 ]
Fang, Ni [1 ]
He, Shengming [2 ]
Wu, Feng [1 ]
Li, Outing [1 ]
Shi, Linjun [1 ]
Ding, Renshan [2 ]
机构
[1] Hohai Univ, Coll Energy & Elect Engn, Nanjing 211100, Peoples R China
[2] Yalong River Hydropower Dev Co Ltd, Chengdu 610051, Peoples R China
基金
中国国家自然科学基金;
关键词
hydropower-wind-photovoltaic hybrid systems; electricity markets; two-stage stochastic optimization; bilateral contract decomposition; spot market; mixed-integer linear programming; ELECTRICITY MARKETS; OPTIMIZATION; OPERATION; SOLAR; MODEL;
D O I
10.3390/su16031093
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
With the advancement of China's electricity markets and the continuous development of renewable energy sources (RESs), it is of great importance to investigate the strategic behavior of RESs in electricity markets. In this paper, a two-stage stochastic optimization model is proposed for a hybrid energy system composed of cascade hydropower plants, wind farms, and photovoltaic stations. Firstly, typical scenarios are generated based on Latin hypercube sampling (LHS) and the K-means clustering algorithm to represent uncertainties of wind-photovoltaic power outputs. Then, with an analysis of China's electricity market structure, a two-stage coordinated scheduling model of hydropower-wind-photovoltaic hybrid systems in electricity markets is established with the objective of maximizing total revenues considering bilateral contract decomposition, the day-ahead energy market, and the real-time balance market. In addition, the proposed model is transformed into a mixed-integer linear programming (MILP) problem for computational convenience. As shown in an analysis of case studies, cascade hydropower plants can compensate for the fluctuation in wind and photovoltaic power outputs to reduce financial risks caused by uncertainties of wind and photovoltaic power generation. Simulation results show that compared with uncoordinated operation, the coordinated operation of hydropower-wind-photovoltaic hybrid systems increases total revenue by 1.08% and reduces the imbalance penalty by 29.85%.
引用
收藏
页数:19
相关论文
共 50 条
  • [21] Two-stage Stochastic Scheduling of Transportable Energy Storage Systems for Resilient Distribution Systems
    Yao, Shuhan
    Zhao, Tianyang
    Zhang, Huajun
    Wang, Peng
    Goel, Lalit
    2018 IEEE INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS (PMAPS), 2018,
  • [22] A Stochastic Two-Stage Model for the Integrated Scheduling of the Electric and Natural Gas Systems
    Kanelakis, Nikolaos G.
    Biskas, Pandelis N.
    Chatzigiannis, Dimitris, I
    Bakirtzis, Anastasios G.
    IEEE OPEN ACCESS JOURNAL OF POWER AND ENERGY, 2020, 7 : 453 - 466
  • [23] Medium- and Long-term Contract Energy Decomposition Model for Cascade Hydropower Station Considering Spot Market Bidding Space
    Yu X.
    Li Y.
    Jia Z.
    Li G.
    Cheng C.
    Cao R.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2021, 45 (06): : 62 - 71
  • [24] Two-Stage Stochastic Programming Scheduling Model for Hybrid AC/DC Distribution Network Considering Converters and Energy Storage System
    Kang, Peng
    Guo, Wei
    Huang, Weigang
    Qiu, Zejing
    Yu, Meng
    Zheng, Feng
    Zhang, Yachao
    APPLIED SCIENCES-BASEL, 2020, 10 (01):
  • [25] Two-stage Optimal Scheduling of Virtual Power Plant with Wind-Photovoltaic-Storage-Electric Vehicles in the Day-ahead Market
    Nhung Nguyen Hong
    Quan Dang Minh
    Phuc Vu Minh
    2023 ASIA MEETING ON ENVIRONMENT AND ELECTRICAL ENGINEERING, EEE-AM, 2023,
  • [26] A Two-Stage Dispatching Method for Wind-Hydropower-Pumped Storage Integrated Power Systems
    Hu, Shuai
    Xiang, Yue
    Liu, Junyong
    Li, Jianhua
    Liu, Chang
    FRONTIERS IN ENERGY RESEARCH, 2021, 9
  • [27] Two-stage stochastic optimization for unit commitment considering wind power based on scenario analysis
    Wang, Xiaofei
    Hu, Zhijian
    Zhang, Menglin
    Hu, Mengyue
    2016 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED), 2016,
  • [28] Two-Stage Stochastic Optimization for the Strategic Bidding of a Generation Company Considering Wind Power Uncertainty
    De, Gejirifu
    Tan, Zhongfu
    Li, Menglu
    Huang, Liling
    Song, Xueying
    ENERGIES, 2018, 11 (12)
  • [29] Day-ahead dispatch approach for cascaded hydropower-photovoltaic complementary system based on two-stage robust optimization
    Wang, Zizhao
    Wu, Feng
    Li, Yang
    Li, Jingyan
    Liu, Ying
    Liu, Wenge
    ENERGY, 2023, 265
  • [30] Two-Stage Scheduling Strategy for Integrated Energy Systems Considering Renewable Energy Consumption
    Liu, Xinghua
    Xie, Shenghan
    Tian, Jiaqiang
    Wang, Peng
    IEEE Access, 2022, 10 : 83336 - 83349