Two-machine flowshop scheduling with fuzzy processing times and flexible operations

被引:2
|
作者
Uruk, Zeynep [1 ]
Yalciner, Ayten Yilmaz [1 ]
机构
[1] Sakarya Univ, Dept Ind Engn, Sakarya, Turkiye
关键词
scheduling; flowshop; makespan; fuzzy processing times; flexible operations; SINGLE-MACHINE; SHOP; JOHNSONS; JOBS; OPTIMIZATION; ALGORITHM;
D O I
10.1504/EJIE.2024.135387
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers a two-machine flowshop scheduling problem with fuzzy processing times and flexible operations to minimise makespan. The jobs have three operations, one of which is a flexible operation that can be processed on one of the machines. The flexible operation should be assigned to one of the machines. Moreover, the processing times on the machines are not fixed but fuzzy processing times which are assumed to have triangular possibility distributions. Firstly, a possibilistic mathematical model is proposed with fuzzy processing times and then it is converted to an auxiliary crisp model using the weighted average defuzzification method. For the large cases where the exact algorithm may not be efficient, a heuristic algorithm is proposed. [Received: 24 May 2022; Accepted: 18 October 2022]
引用
收藏
页码:100 / 119
页数:21
相关论文
共 50 条
  • [31] Two-machine flowshop scheduling with bicriteria problem
    Chou, FD
    Lee, CE
    COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 36 (03) : 549 - 564
  • [32] Two-machine flowshop scheduling with availability constraints
    Lee, CY
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 114 (02) : 420 - 429
  • [33] Two-machine flowshop dynamic scheduling problem
    Chou, Fuh-Der
    Lee, Ching-En
    Kung Yeh Kung Chieng Hsueh K'an/Journal of the Chinese Institute of Industrial Engineers, 1998, 15 (04): : 315 - 324
  • [34] Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times
    S. Afshin Mansouri
    S. Hamed Hendizadeh
    Nasser Salmasi
    The International Journal of Advanced Manufacturing Technology, 2009, 40 : 1216 - 1226
  • [35] Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times
    Mansouri, S. Afshin
    Hendizadeh, S. Hamed
    Salmasi, Nasser
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 40 (11-12): : 1216 - 1226
  • [36] Two-machine no-wait flowshop scheduling with learning effect and convex resource-dependent processing times
    Liu, Yuelei
    Feng, Zuren
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 75 : 170 - 175
  • [37] Minimizing total tardiness in a two-machine flowshop with uncertain and bounded processing times
    Allahverdi, Muberra
    RAIRO-OPERATIONS RESEARCH, 2023, 57 (03) : 1353 - 1375
  • [38] PSO and simulated annealing for the two-machine flowshop scheduling problem with coupled-operations
    Meziani, Nadjat
    Boudhar, Mourad
    Oulamara, Ammar
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2018, 12 (01) : 43 - 66
  • [39] A two-machine multi-family flowshop scheduling problem with batch processing
    Yang, DL
    Chern, MS
    Wang, JT
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2001, 8 (04): : 289 - 298
  • [40] A Two-machine Jobshop Scheduling Problem with Convex Processing Times
    Xu, Kailiang
    Luo, Jing
    Sun, Yuchuan
    PROCEEDINGS OF THE 2018 13TH IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (ICIEA 2018), 2018, : 2769 - 2773