A genetic algorithm for fuzzy identical parallel machine scheduling of minimising total weighted tardiness under resource constraint

被引:5
|
作者
Li, Kai [1 ,2 ]
Xu, Liping [1 ,4 ]
Zhang, Han [3 ]
Chen, Jianfu [1 ]
机构
[1] Hefei Univ Technol, Sch Management, Hefei, Anhui, Peoples R China
[2] Minist Educ, Key Lab Proc Optimizat & Intelligent Decis Making, Hefei, Anhui, Peoples R China
[3] Anhui Normal Univ, Sch Econ & Management, Wuhu, Anhui, Peoples R China
[4] Hefei Univ Technol, Sch Management, Hefei 230009, Anhui, Peoples R China
基金
中国国家自然科学基金;
关键词
Resource constraint; total weighted tardiness; fuzzy scheduling; identical parallel machine scheduling; genetic algorithm; HEURISTIC ALGORITHMS; PROCESSING TIMES; JOBS; MAKESPAN; DESIGN; SCHEME; SHOP;
D O I
10.1080/00207543.2024.2323065
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Due to the severity of resource consumption and uncertainty in orders, new challenges have arisen for production scheduling in enterprises. This paper studies the scheduling problem of minimising the total weighted tardiness for jobs with fuzzy processing times and due dates on identical parallel machines with resource constraint. To address this research problem, we first propose methods to calculate the upper bound of resource consumption and the maximum number of machines that can be used, effectively reducing the search space and improving the algorithm's efficiency. Secondly, a local search algorithm based on job swapping is proposed to enhance the algorithm's performance. Then, repair algorithms based on job removal and job swapping are designed to repair infeasible solutions. Finally, we propose a fuzzy genetic algorithm (FGALS) to solve the problem based on the above elements. Through extensive simulation experiments, the effectiveness and efficiency of the FGALS algorithm are verified by comparing it with commercial solver Gurobi and several meta-heuristic algorithms.
引用
收藏
页码:7619 / 7643
页数:25
相关论文
共 50 条
  • [31] GRASP with path-relinking for the non-identical parallel machine scheduling problem with minimising total weighted completion times
    Rodriguez, F. J.
    Blum, C.
    Garcia-Martinez, C.
    Lozano, M.
    ANNALS OF OPERATIONS RESEARCH, 2012, 201 (01) : 383 - 401
  • [32] GRASP with path-relinking for the non-identical parallel machine scheduling problem with minimising total weighted completion times
    F. J. Rodriguez
    C. Blum
    C. García-Martínez
    M. Lozano
    Annals of Operations Research, 2012, 201 : 383 - 401
  • [33] Solving identical parallel machine production line scheduling problem with special procedure constraint by genetic algorithm
    Liu, Min
    Wu, Cheng
    Yin, Wen-Jun
    Zidonghua Xuebao/Acta Automatica Sinica, 2001, 27 (03): : 381 - 386
  • [34] Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness
    Balasubramanian, H
    Mönch, L
    Fowler, J
    Pfund, M
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (08) : 1621 - 1638
  • [35] Single machine scheduling to minimize total weighted tardiness
    Cheng, TCE
    Ng, CT
    Yuan, JJ
    Liu, ZH
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 165 (02) : 423 - 443
  • [36] Dominance rules for the parallel machine total weighted tardiness scheduling problem with release dates
    Jouglet, Antoine
    Savourey, David
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (09) : 1259 - 1266
  • [37] An exact algorithm for identical parallel machine scheduling under scenarios
    Xie Han-Xin
    Wang Bing
    2020 3RD WORLD CONFERENCE ON MECHANICAL ENGINEERING AND INTELLIGENT MANUFACTURING (WCMEIM 2020), 2020, : 341 - 344
  • [38] One machine fuzzy scheduling to minimize total weighted tardiness, earliness, and recourse cost
    Dong, Yanwen
    International Journal of Smart Engineering System Design, 2003, 5 (03): : 135 - 147
  • [39] New genetic algorithm for parallel machine scheduling with process constraint
    Yin, Wen-Jun
    Liu, Min
    Wu, Cheng
    Tien Tzu Hsueh Pao/Acta Electronica Sinica, 2001, 29 (11): : 1482 - 1485
  • [40] Minimising total weighted earliness and tardiness on parallel machines using a hybrid heuristic
    M'Hallah, Rym
    Al-Khamis, Talal
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (10) : 2639 - 2664