Multi-objective cooperative optimization of reservoir scheduling and water resources allocation for inter-basin water transfer project based on multi-stage coupling model

被引:9
|
作者
Jia, Danni [1 ,2 ]
Zhang, Te [1 ,2 ]
Wu, Lianzhou [1 ,2 ]
Su, Xiaoling [1 ,2 ]
Bai, Tao [3 ]
Huang, Qiang [3 ]
机构
[1] Northwest A&F Univ, Key Lab Agr Soil & Water Engn Arid Semiarid Areas, Minist Educ, Yangling 712100, Peoples R China
[2] Northwest A&F Univ, Coll Water Resources & Architectural Engn, Yangling 712100, Peoples R China
[3] Xian Univ Technol, State Key Lab Ecohydraul Northwest Arid Reg China, Xian 710048, Peoples R China
关键词
Multi-stage couple model; Reservoir scheduling; Water resources allocation; Inter basin water transfer project; MANAGEMENT; BENEFIT; DEMAND; SCHEME; RIVER; LAND;
D O I
10.1016/j.jhydrol.2024.130673
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The efficient coupling of a water allocation model with a reservoir operation model is key to maximizing the benefits of inter-basin water transfer (IBWT) projects. Most existing studies of IBWT operations and management do not account for matching water transfer and demand, and instead seek to optimize either the water allocation model or the reservoir scheduling model. In this paper, we propose a multi-stage joint optimization framework for reservoir scheduling and water allocation models that considers the key operation indicators of the project in the water source area and the multi-dimensional objectives in the receiving area. We derived a functional relationship that balances considerations regarding water, the economy, and ecology (WEE) in the receiving area and applied it to the water allocation model. The reservoir operation model was developed by considering the multiple benefits of water transfer and power generation in the water resource area. To reduce the complexity of the model and the tightness of its coupling, the model was divided into multiple stages of optimization and solved using the Multi-objective Evolutionary Algorithm Based on Decomposition (MOEA/D) algorithm. The results showed the allocation schemes of water resources influenced the competition between the economic and ecological benefits. Using the WEE model, a more reasonable water transfer and allocation method can be selected according to different development needs. As such, the water shortage rate of each user in the receiving area is kept below 8%, and there is significant improvement in all indicators compared with the conventional scheme. In addition, this model enables the reservoir group to achieve a power generation capacity of more than 5.64 kWh with the goal of meeting the water transfer demand, maintaining the reservoir empty rate at about 10%, and reducing the risk of water shortages. Our study can serve as a reference for effectively addressing the challenges associated with IBWT projects, and it can inform socioeconomic development in receiving areas while optimizing water transmission and allocation.
引用
收藏
页数:19
相关论文
共 50 条
  • [11] A robust multi-objective bargaining methodology for inter-basin water resource allocation: a case study
    Nasiri-Gheidari, Omid
    Marofi, Safar
    Adabi, Farzaneh
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2018, 25 (03) : 2726 - 2737
  • [12] A Multi-Objective and Equilibrium Scheduling Model Based on Water Resources Macro Allocation Scheme
    Wang, Ting
    Liu, Yu
    Wang, Ying
    Xie, Xinmin
    You, Jinjun
    WATER RESOURCES MANAGEMENT, 2019, 33 (10) : 3355 - 3375
  • [13] A Multi-Objective and Equilibrium Scheduling Model Based on Water Resources Macro Allocation Scheme
    Ting Wang
    Yu Liu
    Ying Wang
    Xinmin Xie
    Jinjun You
    Water Resources Management, 2019, 33 : 3355 - 3375
  • [14] Water Transfer Triggering Mechanism for Multi-Reservoir Operation in Inter-Basin Water Transfer-Supply Project
    Zeng, Xiang
    Hu, Tiesong
    Guo, Xuning
    Li, Xinjie
    WATER RESOURCES MANAGEMENT, 2014, 28 (05) : 1293 - 1308
  • [15] Multi-reservoir operating rule in inter-basin water transfer-supply project
    Guo, Xu-Ning
    Hu, Tie-Song
    Lu, Yi-Bing
    Zhang, Tao
    Shuili Xuebao/Journal of Hydraulic Engineering, 2012, 43 (07): : 757 - 766
  • [16] Water Transfer Triggering Mechanism for Multi-Reservoir Operation in Inter-Basin Water Transfer-Supply Project
    Xiang Zeng
    Tiesong Hu
    Xuning Guo
    Xinjie Li
    Water Resources Management, 2014, 28 : 1293 - 1308
  • [17] Bilevel model for multi-reservoir operating policy in inter-basin water transfer-supply project
    Guo, Xuning
    Hu, Tiesong
    Zhang, Tao
    Lv, Yibing
    JOURNAL OF HYDROLOGY, 2012, 424 : 252 - 263
  • [18] The Optimal Operation of Parallel Pumping Stations for Inter-Basin Water Transfer Based on the Multi-Objective Optimization of a Single Pumping Station
    Gong, Yi
    Zhu, Bowen
    PROCESSES, 2022, 10 (10)
  • [19] Multi-level Multi-object Inter-basin Water Resources Allocation Model Based on the Evolution of Coordination Degree
    Niu Wen-juan
    Wang Hui-min
    2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (15TH), VOLS I AND II, CONFERENCE PROCEEDINGS, 2008, : 153 - 160
  • [20] An Interval Parameter Model for Cooperative Inter-Basin Water Resources Allocation Considering the Water Quality Issues
    Nikoo, Mohammad Reza
    Kerachian, Reza
    Poorsepahy-Samian, Hamed
    WATER RESOURCES MANAGEMENT, 2012, 26 (11) : 3329 - 3343